Find or Sell any Parts for Your Vehicle in USA

1996 Polaris 500 Fan Indy Trail: Fuji Ec 50 Pm04- Short Block Motor on 2040-parts.com

Location:

Noblesville, Indiana, United States

Noblesville, Indiana, United States
Condition:Used

1996 POLARIS 500 fan INDY TRAIL sled w 2791 miles on her- parts:
FUJI EC 50 PM04- SHORT BLOCK MOTOR- ran great at tear down with 150 oer cylinder- motor in great condition looking thru EXHAUST and INTAKE ports. This is great for the guy with a blown motor- put your stuff on this short block and be back on the snow- includes oil pump
FREE SHIP LOWER 48 ONLY

Drivers 'don't care' about engine oil

Thu, 10 Oct 2013

JUST 4% of drivers choose which engine oil goes into their car during a service, according to new research. The remaining 96% either don’t care or simply go with whatever a mechanic recommends, leading to calls from a leading engine oil manufacturer and the Institute of Advanced Motorists (IAM) for raised awareness of the benefits of high-grade engine lubricants. In a study of 1,000 drivers, conducted on behalf of Mobil 1, 65% said they wouldn’t know what oil viscosity their car would need to take, while 69% added they had no idea which brand of oil their car manufacturer recommends.

BMW X6 M50d (2012) leads facelifted X6 range

Wed, 25 Jan 2012

BMW is facelifting its most controversial model, the X6. And what better way of tidying up this coupe-cum-SUV than adding a diesel M version? The new X6 M50d is among the first of a new range of stop-gap M models to slot between the full M GmbH cars and the trim-level M Sport models.

Seat completes industry's largest solar panel installation

Mon, 25 Nov 2013

SEAT HAS completed construction of the largest solar panel installation in the automotive industry. The huge 'Seat al Sol' array at the firm’s Martorell plant outside Barcelona is the size of 40 football pitches and generates 15 million kilowatt hours of power per year courtesy of the reliable Spanish sunshine. The electricity produced is enough to account for a quarter of the amount needed to build a year’s allocation of Leons, reducing the factory’s energy bills significantly and saving 7,000 tonnes of CO2 per year.