02-07 Subaru Impreza Wrx 03-08 Forester Passenger Front Spindle Knuckle Hub Rh on 2040-parts.com
Marlette, Michigan, US
Other for Sale
- 92-00 lexus sc 300 400 wheel bearing spindle hub front(US $125.00)
- 92-00 lexus sc300 sc400 sc wheel bearing rear hub assy complete lh or rh oem(US $99.00)
- 98-05 lexus gs300 gs400 gs430 wheel bearing rear hub assy complete lh or rh oem(US $99.00)
- 89-92 toyota supra turbo complete front cradle k-member & rack & suspension oem(US $449.00)
- 86-92 toyota supra mkiii wheel spindle hub bearing lr(US $169.00)
- Monroe electronic to passive suspension conversion kit(US $145.15)
Nissan’s EV onslaught continues with Townpod
Thu, 30 Sep 2010Nissan’s Townpod will be the company’s third electric vehicle (a battery-powered version of the NV200 commercial vehicle will slot in after the Leaf) and is slated for a late 2012 arrival in the UK. Looking remarkably like a character from Pixar’s Cars film, the Townpod takes the lithium-ion battery-powered drivetrain of the Leaf and cloaks it in urban friendly sheetmetal. The long wheelbase and zero overhangs results in a huge cabin, accessed by some trick doors – rear-hinged rear doors and a vertically split rear door.
Monaco Grand Prix: It’s a Mercedes front row
Sat, 25 May 2013Nico Rosberg & Lewis Hamilton pictured after making it a Mercedes front row in Monaco Two weeks ago in Spain, Nico Rosberg pipped team mate Lewis Hamilton to pole position, and he’s pulled the same trick on the streets of Monaco today to ensure the second Mercedes front row in succession and his own third pole position in a row. Behind the Mercedes it’s a Red Bull second row, with Sebastian Vettel taking third place and Mark Webber fourth, with the third row made up of the Lotus of Kimi Raikkonen and the Ferrari of Fernando Alonso. McLaren managed to take seventh (Perez) and ninth (Button) with Sutil’s Force India in eighth and Vergne’s Torro Rosso in tenth.
Green Light For More Smart Motorway Schemes
Wed, 09 Jul 2014THE Government has announced plans to speed up journey times on selected parts of the nation’s motorway network. As a result, work will start to convert the hard shoulder into a running lane on two sections of the M1 and on a stretch of the M3. The M1 work will be between junctions 28 and 31 in Derbyshire and between junctions 32 and 35a in South Yorkshire, with claims that it will boost capacity by up to a third and improve journey times by up to 10%.