Find or Sell any Parts for Your Vehicle in USA

1989 Pz480 Yamaha Pz 480 Phazer Tool Box And Tool Kit on 2040-parts.com

US $34.99
Location:

Payette, Idaho, United States

Payette, Idaho, United States
Condition:Used Brand:Yamaha

BE SURE AND CHECK OUT MY STORE FOR LOTS OF GREAT DEALS.  Visit My eBay Store: Hooter's Vintage Cycle Parts  I SHIP DAILY AND I OFFER SHIPPING DISCOUNTS TO SAVE YOU $$$$$$$$$$.

I AM PARTING OUT A 1989 YAMAHA PZ480 PHAZER.  ALL THE PARTS I HAVE FOR THIS ARE LISTED.  

THIS IS THE TOOL BOX AND TOOL KIT.

COMES COMPLETE WITH ALL PARTS SHOWN.  

I DON'T KNOW IF THESE ARE ALL THE TOOLS OR THE RIGHT ONES BUT THEY ARE WHAT WAS IN THE BOX.

ALL TOOLS SHOW A LITTLE NORMAL WEAR BUT ARE STILL IN GREAT SHAPE.  

BOX ISN'T CRACKED OR BROKEN AND BOTH HALVES FIT TOGETHER NICELY.

ITEM IS SOLD AS IS WITH NO WARRANTY EXPRESSED OR IMPLIED.  

IDAHO RESIDENTS WILL BE CHARGED 6% SALES TAX.

FREE SHIPPING IS FOR UNITED STATES CUSTOMERS ONLY.

Nissan Leaf recall could force replacement of entire car

Tue, 20 May 2014 00:00:00 -0700

Nissan is recalling a total of 211 examples of the the Leaf pure-electric car supplied to the U.S., and another 65 Leafs sold in Canada for a problem involving missing spot welds in the motor compartment. The National Highway Traffic Safety Administration (NHTSA) says that the front structural member assemblies in these cars could be missing welds in several crucial places, to the left and right of the electric motor. As a result, the affected Leafs might not perform well in a crash.

Bentley Continental GT Speed (2014) fastest Bentley ever revealed

Tue, 25 Feb 2014 00:00:00 -0800

By Ollie Kew First Official Pictures 25 February 2014 15:00 Bentley has unveiled its fastest road car ever: the new (and aptly named) Continental GT Speed. The uprated flagship is the perfect anecdote to the sensible Flying Spur V8 model also revealed today. Thought Bentley was going soft?

Detroit Electric delays SP:01 EV

Mon, 03 Jun 2013 00:00:00 -0700

Detroit Electric will delay the SP:01 EV roadster for at least a month, according to a company executive who talked to the Detroit News. The company still hasn’t finalized a manufacturing location in Wayne County. Production was scheduled to start in August, now it’s slated for September.