2" Spacer Vortex Move Injection Forward Or Back Black Xcelerator Enderle on 2040-parts.com
Nashville, Tennessee, United States
Superchargers & Parts for Sale
- Procharger 2012-13 ford mustang boss 302 ho intercooled tuner kit w/p-1sc-1(US $5,919.00)
- Cts-v lsa supercharger lid(US $250.00)
- Used procharger super charger turbo(US $950.00)
- 2.75" adm lsa 6 rib pulley(US $100.00)
- Mishimoto supercharger intercooler(US $199.00)
- Vortech v3 oil slinger(US $41.50)
Toyota outlines quality reforms; chief bows out of U.S. hearings
Wed, 17 Feb 2010Conceding that breakneck expansion led to Toyota Motor Corp.'s current recall crisis, president Akio Toyoda outlined reforms meant to get quality back on track, including more active use of the car's so-called black box crash data recorder. Toyoda, grandson of the carmaker's founder, also indicated he won't sit before Congressional hearings into the quality lapses that have triggered recalls of more than 8.5 million vehicles since last fall. Yoshimi Inaba, the head of Toyota's U.S.
Mitsubishi bringing i MiEV Sport Air concept to Geneva
Mon, 26 Jan 2009Mitsubishi will show another iteration of its sporty micro-size electric car with the debut of the i MiEV Sport Air concept at the Geneva motor show in March. Building on the i MiEV Sport, which we first saw at the Tokyo motor show in 2007, Mitsubishi adds a clear removable roof and slight alterations to the front fascia. A lithium-ion battery powers three magnetic synchronous motors--one in each front wheel and one to drive both rear wheels--with an all-wheel control system managing stability and traction control, and ABS for optimal stability and performance.
College Exhibition: Pforzheim University Summer Degree Show 2004
Tue, 28 Dec 2004Transportation Design students at Germany's Pforzheim University displayed their work in the school's summer Transportation Design degree show in July, one of the two graduation shows per year. The Pforzheim Transportation Design courses lead to BA and MA degrees. The exhibition included work from graduating Diploma and Masters students, exterior and interior projects by the 5th and 7th semester students, as well as work from students in the earlier stages of the diploma and masters courses.