Find or Sell any Parts for Your Vehicle in USA

2001-2012 Suzuki Gsxr 1000 Black Billet Fluid Reservoir Cap Logo Engraved Gsx-r on 2040-parts.com

US $14.99
Location:

Niagara Falls, US

Niagara Falls, US
Returns Accepted:Returns Accepted Refund will be given as:Money back or exchange (buyer's choice) Item must be returned within:30 Days Return shipping will be paid by:Buyer Restocking Fee:No

Decals, Emblems for Sale

Subaru Stella

Tue, 20 Jun 2006

Fuji Heavy Industries, manufacturer of Subaru vehicles and aerospace-related products, today announced the introduction of the Subaru Stella, an all-new mini car for the Japanese market. The Stella follows the 'Think.Feel.Drive' message delivered by the Subaru B5-TPH concept at the Tokyo Motor Show last year, albeit in somewhat less glamorous clothes. It does, however, similarly tap into the popularity of 'green' cars, boasting the class?s most efficient engine.

Audi S1 at Paris

Sat, 11 Sep 2010

The Audi S1 will have a Paris Launch (A1 Wörthersee Concept pictured) It’s getting on for a year since we reported that – despite some saying it wouldn’t happen – Audi were planning at least a warm version of the A1 and had on the drawing board the Audi S1 to take on the MINI Cooper. So it’s not a shock that we hear Audi are planning on bring the S1 along to Paris for a reveal before getting the S1 on the roads by the second quarter of 2011. Expect the usual Audi S bits in the mix  - bigger wheels, fettled suspension, beefed-up brakes, body kit – and power in the S1 to come from the S/C turbo 1.4 TSI found in the VW Polo GTI, although the S1 may just get a tweaked version of the engine as befits its higher standing in the VW hierarchy with a bit more than the 178 horses the Polo GTI manages.

Camaro plant gets more work; recall issued

Thu, 07 May 2009

The strong early demand for the Chevrolet Camaro has General Motors looking to crank more units out of the Oshawa, Ontario, assembly plant. The Oshawa plant was exempt from GM's recent announcement of shutdowns of as long as nine weeks for several of its plants--primarily those that build pickups and SUVs. Oshawa will increase Camaro output by adding overtime and an extra week to the plant's production schedule.