2004 - 2008 Suzuki Forenza Reno Glove Box Latch Handle on 2040-parts.com
Fort Wayne, Indiana, United States
Removed from a 2006 forenza.
Grey |
Glove Box for Sale
- 97-05 uplander montana venture silhouette transsport glove box latch tan no key(US $11.99)
- 2002 - 2006 nissan altima glove box latch handle glovebox lock grey, oem(US $19.99)
- Ford xl3z 1506072 aaf latch
- 2 x bmw genuine glove box rubber buffer for 3 5 7 series e28 e30 e32 e34(US $7.03)
- Uro parts 51161849472 compartment latch(US $19.67)
- Bmw genuine turn signal lamp right x3 2.5i x3 3.0i e83(US $25.26)
Mazda's new design strategy revealed in autumn 2010
Tue, 22 Jun 2010By Tim Pollard Motor Industry 22 June 2010 21:56 Mazda will show off its first 'post-Nagare' concept car in autumn 2010 – providing a glimpse into the future design strategy under the new styling boss. Nagare has been the design mantra at Mazda since the series of concepts kicked off in 2006 with the eponymous show car, each influenced by flowing waves and patterns from nature. But since the departure of design chief Laurens van den Acker, who defected to Renault, the Japanese company is looking for a fresh direction, CAR understands.So when will we see the new Mazda design concept?At a Mazda 'Design Forum' to be held in Italy in September 2010.
New Kia Sorento at Frankfurt
Mon, 10 Aug 2009The new Kia Sorento will get its debut at the Frankfurt Motor Show The new Kia Sorento – a seven seat SUV – is longer, lower and more aerodynamic than the current model. Its length has increased by 18mm and its drag coefficient drops to 0.38 – down from 0.43 – which will help with economy. And Kia says that the new Sorento has been set up to be more road-biased, without losing any of the Sorento’s off-road ability.
Camaro plant gets more work; recall issued
Thu, 07 May 2009The strong early demand for the Chevrolet Camaro has General Motors looking to crank more units out of the Oshawa, Ontario, assembly plant. The Oshawa plant was exempt from GM's recent announcement of shutdowns of as long as nine weeks for several of its plants--primarily those that build pickups and SUVs. Oshawa will increase Camaro output by adding overtime and an extra week to the plant's production schedule.