Find or Sell any Parts for Your Vehicle in USA

4 Pcs Wheel Spacers Adapters Fit Chevy Cadillac Gmc Chevrolet 1988-2014 1" Thick on 2040-parts.com

US $67.00
Location:

Greeley, Colorado, United States

Greeley, Colorado, United States
Condition:New Brand:OEM Replacement Hub Bore Size:82.5 MM Manufacturer Part Number:Does not apply Wheel Bolt Pattern:6x5.5"(6x139.7 MM) Placement on Vehicle:Left, Right, Front, Rear Vehicle Bolt Pattern:6x5.5"(6x139.7 MM) Warranty:Yes Material:Forged 6061 T6 Grade Aluminum Surface Finish:SILVER Total Width:Each Spacer is 1" Wide Thickness:1"(25.4 MM) Thread Pitch:1/2-20

Wheel Lugs for Sale

Mini factory celebrates its 100th birthday

Thu, 28 Mar 2013

A bastion of the British car-building industry, Mini’s ‘Plant Oxford’ in Cowley, Oxford celebrates 100 years of building cars today (28 March 2013). Currently responsible for producing the second-gen BMW Mini range, Plant Oxford has been the birthplace more than just trendy city cars: it’s stamped out over 11.5 million cars since 1913, including legend like the Morris Minor and Frogeye Sprite, and clunkers like the Morris Marina. It also contributed to the war effort by repairing damaged RAF fighter aircraft during the Second World War.

Honda Boosts Civic Tourer Appeal

Tue, 11 Feb 2014

HONDA’S new Civic Tourer’s arrival in the showrooms is just around the corner, and already the Japanese car maker is making its compact family wagon more affordable. Prospective buyers are to be tempted by a range of attractive finance offers – including low monthly payments and zero percent APR – and Honda’s new optional fixed-price five-year aftercare package. In addition to the competitive monthly payment plans, Honda’s new fixed-price comprehensive aftercare package includes five years’ servicing, five years’ warranty and five years’ roadside assist.

Seat completes industry's largest solar panel installation

Mon, 25 Nov 2013

SEAT HAS completed construction of the largest solar panel installation in the automotive industry. The huge 'Seat al Sol' array at the firm’s Martorell plant outside Barcelona is the size of 40 football pitches and generates 15 million kilowatt hours of power per year courtesy of the reliable Spanish sunshine. The electricity produced is enough to account for a quarter of the amount needed to build a year’s allocation of Leons, reducing the factory’s energy bills significantly and saving 7,000 tonnes of CO2 per year.