Find or Sell any Parts for Your Vehicle in USA

48521-cb027 Nissan Murano Oem New Inner Tie Rod on 2040-parts.com

US $66.00
Location:

Chelsea, Massachusetts, US

Chelsea, Massachusetts, US
Item must be returned within:14 Days Refund will be given as:Money Back Return shipping will be paid by:Buyer Restocking Fee:No Returns Accepted:Returns Accepted Return policy details:Returns ONLY accepted for defective items, NOT "it doesnt fit" or 'it didnt' fix my car' Brand:Nissan Manufacturer Part Number:48521-CB027 Placement on Vehicle:Array Country of Manufacture:Japan

This is a brand new, OEM, in the box, nissan murano inner tie rod end. 48521-CB027. it fits all 2005-2007 muranos, and will fix the loose one you might have now. this will tighten up your front end, and promote even tire wear, and restore your factory handling.


Free shipping to lower 48 United States only. NO INTERNATIONAL SHIPPING. sorry it causes too many headaches.

this is the same part you would find from the nissan dealer for $180+

any questions feel free to ask. However, questions about fitment are discouraged, as the part number is provided in the listing, and interchange is your responsibility.

GM recalls small cars to fix steering problem

Tue, 02 Mar 2010

A problem with the power-steering system is prompting General Motors to recall 1.3 million small cars. There have been reports of 14 crashes and one injury related to the steering problem, GM said on Tuesday. The recall covers 2005-10 Chevrolet Cobalts and 2007-10 Pontiac G5s sold in the United States.

Mercedes GLA Concept leaks ahead of Shanghai Motor Show debut

Wed, 17 Apr 2013

But ahead of a debut of the production ready GLA at Frankfurt, Mercedes are taking a GLA Concept – which is pretty much what the production version will be – to the Shanghai Motor Show this month. But it’s arrived early. Thanks to a German website publishing the pictures ahead of time (which they’ve subsequently removed) we get our first look at Mercedes latest addition to the A Class family – and it does look quite convincing.

Ford overhauls Michigan plant to build new Focus

Wed, 06 May 2009

Ford will spend $550 million to retool an assembly plant in suburban Detroit to build the redesigned 2011 Ford Focus. Production is to start next year. As part of the overhaul, the plant, known as Michigan Assembly, also will build an electric-powered version of the new Focus.