69j-13440-01-00 Element Assy, Oil Cleaner Yamaha Jet Boat Fx1800a Outboard on 2040-parts.com
Henderson, Nevada, United States
New OEM Yamaha Jet Boat and Outboard Element Assy, Oil Cleaner. 69J-13440-01-00 Please check with your local dealer or internet for fitment. FREE First Class Shipping in the Continental US only. Paypal to a Confirmed address only please. |
Oil Systems for Sale
- Auto boat car truck engine pre-lube kit
- Volvo penta 3582732 oil filter marine boat
- Marine oil cooler 2" x 15" copper for engine or transmission(US $125.00)
- Perkins marine diesel transmission cooler 6.354 cleaned and pressure test 30psi(US $300.00)
- Perkins marine diesel oil cooler 6.354 cleaned and pressure test to 30 psi.(US $300.00)
- Perkins marine diesel oil cooler 6.354 intake cap(US $75.00)
2013 Ford Fiesta ST debuts at Geneva
Mon, 05 Mar 20122013 Ford Fiesta ST The 2013 Ford Fiesta ST arrives at Geneva in production guise – after a Fiesta ST Concept last year – and will go on sale early 2013. It looks like Ford has finally managed to fit the new 1.6 litre Ecoboost under the bonnet of the new Fiesta ST (all the cars running around so far have had the lump out of the Zetec S) and has pitched up at Geneva with the production version of the 2013 ST. That 1.6 litre Ecoboost engine is a four-cylinder petrol with 178bhp and 177lb/ft of torque, which gives a sub-7 second 0-62mph and a top speed of 136mph.
Redesigned Ford Escape SUV is recalled for carpet issue
Mon, 16 Jul 2012Ford is recalling about 8,200 copies of the redesigned 2013 Ford Escape SUV to fix a carpeting flaw that could affect the driver's ability to use the brakes. Ford says the affected vehicles were built between March 8 and June 7, 2012. According to Ford, an improperly installed piece of carpet padding on the center-console trim panel could cause a driver's foot to hit the side of the side of the brake pedal when moving from the accelerator pedal.
Detroit Electric delays SP:01 EV
Mon, 03 Jun 2013Detroit Electric will delay the SP:01 EV roadster for at least a month, according to a company executive who talked to the Detroit News. The company still hasn’t finalized a manufacturing location in Wayne County. Production was scheduled to start in August, now it’s slated for September.