Find or Sell any Parts for Your Vehicle in USA

94-97 Dodge Ram Truck Cup Holder Pickup 95 96 1996 1997 1500 2500 3500 Cupholder on 2040-parts.com

US $59.99
Location:

Austin, Pennsylvania, US

Austin, Pennsylvania, US
Returns Accepted:Returns Accepted Item must be returned within:14 Days Refund will be given as:Money Back Return shipping will be paid by:Buyer Return policy details:ALL SHIPPING CHARGES ARE NONREFUNDABLE, UNLESS I SENT THE WRONG ITEM. Restocking Fee:No Placement on Vehicle:Front Surface Finish:BLACK Part Brand:Factory, OEM

2015 Honda Civic Type R previewed on video with ‘at least 276 bhp’

Sun, 24 Nov 2013

2015 Honda Civic Type R previewed on video with ‘at least 276 bhp’ The Honda Civic Type R has died a death as new emission regulations sounded the death knell for the high-revving naturally aspirated lump under its bonnet. But Honda are planning on bringing the Type R back to life in 2015, but rather than a VTEC engine that only wanted to really play over 5000 rpm, Honda are heading back to hot hatch goodness with a new turbo engine that promises ‘at least’ 276bhp. That should make the next Honda Civic Type R not only a lot quicker than the last Type R, but its power will be accessible much lower down the rev range and economy and emissions will be much improved.

Nissan Pathfinder

Mon, 06 Aug 2012

Nissan has revealed the production version of its latest Pathfinder SUV, first seen in concept form at this year's NAIAS in Detroit. It moves away from the outgoing model in terms of form language, introducing a far more organic and car-like aesthetic. The 2013 model is almost 230kg lighter than its predecessor with a monocoque bodyshell that allowed Nissan designers to create a more aerodynamic exterior without losing headroom or trunk capacity.

KISKA opens new design studio

Thu, 19 Mar 2009

Austrian brand management and design company KISKA has moved its design studio into a modern new building in Salzburg, Austria, just a few meters from its former location. The new headquarters boasts state-of-the-art workstations and has been built to enable the firm to prepare for expansion and new challenges in the years to come. Designed by Hofbauer architects, the 4700m² building was built in just one and a half years.