A/c Condenser-new Condenser Denso 477-0630 Fits 01-05 Honda Civic 1.7l-l4 on 2040-parts.com
Azusa, California, United States
Condensers & Evaporators for Sale
- A/c condenser-new condenser denso 477-0631(US $66.31)
- A/c condenser-new condenser denso 477-0634 fits 06-09 honda civic 1.8l-l4(US $73.17)
- New mercedes w463 g500 g55 amg air condition a/c condenser genuine 4635000454(US $957.95)
- Nissan otti 2005 condenser [7260600](US $269.00)
- Bmw a/c condenser with receiver drier f10 f10n(US $370.97)
- Daihatsu mira 2005 condenser [2860600](US $289.00)
Toyota Yaris Hybrid, GT 86 & new Toyota FT-Bh Concept at Geneva
Fri, 10 Feb 2012Toyota's offerings at Geneva 2012 The Toyota Yaris Hybrid, Toyota GT 86 and a new compact city car concept – the Toyota FT-Bh – will be at the Geneva Motor Show next month. Toyota has a stand full of cars to offer at the 2012 Geneva Motor Show, with the European debut of the GT 86, the Yaris Hybrid, and the world debut of a new concept – the FT-Bh Concept. We already know the price of the Toyota GT 86 – a starting point of £25k – and we’ve seen the photos, so now all that’s left is to see the GT 86 in the flesh.
Citroen C5: news and pics of 2011 facelift
Tue, 26 Oct 2010It’s facelift time for the Citroen C5. The Gallic family car gets a cosmetic fillip, new safety toys and a range of engine revisions to keep it fresh in the face of new competition from the new VW Passat and pepped-up Ford Mondeo. The 153bhp turbocharged 1.6-litre petrol nets lower CO2 emissions, down 14g/km to 153, and economy is also improved, up to 42.2mpg from 39.8.
Report Claims Pothole Repair Blackhole Is £12bn
Thu, 03 Apr 2014FIGURES from the Asphalt Industry Alliance (AIA) have revealed the extent of the nation’s pothole crisis, with a report claiming the "catch-up" cost of getting roads back into reasonable a condition has soared to £12 billion. The total is an increase on the £10.5 billion figure reported last year, and remains high despite more than two million potholes being filled in England and Wales over the last 12 months. This was despite a 20% decrease in the shortfall in annual road maintenance budgets reported by local authorities, with the shortfall reducing from an average of £6.2 million to £5.1 million per authority in England.