Acura Legend 4 Door Sedan 96 1996 Power Roof Sun Roof Switch on 2040-parts.com
Staten Island, New York, United States
1996 ACURA LEGEND SEDAN ORIGINAL EQUIPMENT POWER SUN ROOF SWITCH ASSEMBLY AS PICTURED IN THE ACTUAL PHOTOS, IN GOOD, USED, UNDAMAGED WORKING CONDITION, WITH PIGTAIL.
Powered by eBay Turbo Lister The free listing tool. List your items fast and easy and manage your active items. |
Switches / Controls for Sale
- 83-90 ford bronco ii / ranger passenger right oem power window switch w warranty(US $43.50)
- Audi a8 a 8 97-99 1997-1999 rear defogger defroster defog switch oe# 4d0 941 50(US $29.88)
- Headlight dimmer switch standard cbs-1198 fits 01-06 hyundai santa fe(US $71.83)
- Combination switch standard ds-1015 fits 99-04 jeep grand cherokee(US $83.73)
- Headlight switch standard ds-218(US $26.08)
- Neutral safety switch connector handy pack hp4755(US $21.89)
GM expands credit union program nationally
Thu, 08 Jan 2009General Motors on Wednesday launched a nationwide test program that gives 90 million credit union members access to the company's Credit Union Member Discount Program with participating GM dealers. The "Invest in America" program also gives members access to financing on new-vehicle purchases. This follows a four-state Midwest program GM began early last month.
Hyundai ix35 FCEV Hydrogen Fuel Cell in production by end 2012
Fri, 17 Aug 2012Hyundai will have its hydrogen powered ix35 FCEV in production by the end of 2012 with full production by 2015. We’ve spotted the Hyundai ix35 FCEV (that’s the hydrogen fuel cell electric vehicle) out in South Korea sporting a new nose a couple of times recently, which apparently doesn’t signal a facelift for the ix35. What it does signal is Hyundai’s commitment to the hydrogen fuel cell as the most sensible fuel for cars in the future and to remove our dependency on oil, and Hyundai has been out promoting that message in London.
Councils to cut roadworks red tape
Tue, 19 Aug 2014COUNCILS in England could soon have the power to cut red tape and make road works much quicker and more accountable. The plan is to introduce permits for any company that wants to dig up a road, which means they will have to co-ordinate their work with other companies and local authorities to reduce the impact of delays on the public. The permit scheme could come into force as early as April 2015 and means anyone applying for a permit to carry out road works will need to present a convincing case for the work.