Find or Sell any Parts for Your Vehicle in USA

Afco 5x4.75 Hub on 2040-parts.com

US $65.00
Location:

East Saint Louis, Illinois, United States

East Saint Louis, Illinois, United States
Condition:New Brand:Afco

Brand new 5x4.75 hub.

New Audi A3 Cabriolet starts at £25,790 – first deliveries April 2014

Wed, 13 Nov 2013

New Audi A3 Cabriolet starts at £25,790 – first deliveries April 2014 The new Audi A3 Cabriolet – the fourth member of Audi’s A3 range – was revealed in September at the Frankfurt Motor Show and now, with first deliveries expected by spring 2014 in the UK, Audi has revealed the new drop-top A3 will cost from £25,790. That will buy you in to the entry-level SE trim which comes with a fully automatic roof in black, 16″ alloys, AirCon, MMI radio, iPod connection, DAB, Bluetooth and prep for an SD card Nav. The Sport and S Line sped A3s sit 15mm lower than the SE and get an acoustic folding roof in a choice of black, grey and brown and you can, if you wish, opt for the softer SE suspension or, if your season ticket for the chiropractor is up to date, spec the S Line with sports suspension.

2015 Audi A8, A8L and S8 unveiled ahead of Frankfurt Motor Show debut

Thu, 22 Aug 2013

At the upcoming Frankfurt motor show, Audi will announce a new A8 with more powerful engines, lighter-weight construction, new assistance systems and Matrix LED headlight technology. Audi says the new A8 will put the German automaker among the innovation leaders in the luxury class. It cites as an example the short-wheelbase A8 3.0-liter TFSI's 4,034-pound curb weight, best in class for all-wheel-drive models.

Sinkhole fears shut commuter route

Tue, 11 Mar 2014

A ROAD in a key transport-link town is to be closed over fears that a sinkhole exists deep under the surface. A hole has appeared in St John's Road in Watford, Hertfordshire, and preliminary investigations carried out last week had to be stopped as there were concerns about undermining the road and footway further. Hertfordshire County Council said: "A geotechnical engineer present during the investigations advised that there is a possibility that a sinkhole exists deep down in the underlying chalk." Following f urther investigations today, the road is being shut until work on it can be completed.