Find or Sell any Parts for Your Vehicle in USA

Allstar Performance Metric Thread Hand File 8-1/2"long .80 To 3.00 Mm #11039 on 2040-parts.com

Location:

Orlando, Florida, United States

Orlando, Florida, United States
Condition:New Manufacturer Part Number:ALL11039 Brand:ALLSTAR Part Brand:ALLSTAR

ALLSTAR PERFORMANCE THREAD FILE

  • ALLSTAR PERFORMANCE
  • #11039
  • METRIC THREAD
  • THREAD FILE
  • HAND FILE
  • 8-1/2" LONG
  • THREAD : .80-1.00, 1.25-1.50, 1.75-2.00, 2.50-3.00 MM
  • REMOVES BURRS FROM DAMAGED EXTERNAL THREADS ON: BOLTS,SPINDLES,AXLE TUBES,THREADED SHAFT,PIPE,AND PIPE FITTINGS

 

 

 

Actual shipping charges and combined shipping. Canada & International shipping Extra.And additional time maybe needed to ship. Accepting Paypal. All sales final, as is race item.

Volvo V40 Cross Country to cost £2500 more than V40

Tue, 02 Oct 2012

It looks like Volvo will be asking around £2500 more for the V40 Cross Country than the regular V40 hatch. Both the Volvo V40 Cross Country and R-Design look great and offer much, but we’ve been busy guessing so far on how much extra extra they will cost when they go on sale. But now we know.

Ferrari HY-KERS hybrid (2010) at Geneva motor show

Tue, 02 Mar 2010

By Tim Pollard First Official Pictures 02 March 2010 08:36 Ferrari today showcased its latest green fuel tech in a new 599 GTB Fiorano concept car dubbed HY-KERS. Maranello announced a five-year eco plan in 2007 when it unveiled the Mille Chili and the HY-KERS is the latest step in the programme. It's a high-performance supercar to display how frugal consumption and razor-sharp responses can go hand in hand, say the Ferrari engineers.Ferrari HY-KERS: the detail The 599 is equipped with a hybrid system claimed to add little extra weight over a conventional V12 599.

Camaro plant gets more work; recall issued

Thu, 07 May 2009

The strong early demand for the Chevrolet Camaro has General Motors looking to crank more units out of the Oshawa, Ontario, assembly plant. The Oshawa plant was exempt from GM's recent announcement of shutdowns of as long as nine weeks for several of its plants--primarily those that build pickups and SUVs. Oshawa will increase Camaro output by adding overtime and an extra week to the plant's production schedule.