Find or Sell any Parts for Your Vehicle in USA

Audi (81-96) Multi Purpose Relay Oem New + 1 Year Warranty on 2040-parts.com

US $24.90
Location:

Glendale, California, United States

Glendale, California, United States
Condition:New Manufacturer Part Number:431 951 253 F Warranty:Yes Other Part Number:431951253F Part Brand:Factory, OEM

Nissan may build more Leaf EVs to meet growing demand

Wed, 07 Aug 2013

Nissan is making plans to begin building more electric Leafs as dealers clamor for more of the once slow-selling car. The automaker's North American factory chief -- who has been visiting with retailers in recent days -- cautions that production will move ahead in small and careful steps. But Nissan is already taking measures to increase its output of electric motors from its engine factory in Decherd, Tenn., says Bill Krueger, Nissan Americas vice chairman and senior vice president for manufacturing, purchasing production engineering and supply chain management.

Local Motors XC2V design competition winners announced

Thu, 17 Mar 2011

The winners of the Local Motors XC2V design competition have been announced. Created in partnership with the Defense Advanced Research Projects Agency (DARPA), the brief called for individuals to co-create a vehicle body design for two different missions – Combat Reconnaissance and Combat Delivery & Evacuation – based on Local Motors' tubular steel chassis. The goal was to create a fast, lightweight, highly capable vehicle that would be suitable for various field missions.

London underpass to hold flood water

Mon, 10 Feb 2014

A PEDESTRIAN UNDERPASS is to be turned into an emergency pond to hold hundreds of thousands of litres of floodwater threatening homes and businesses in south London. The Purley Cross underpass will be used to hold water pumped from around 400 under-threat buildings in parts of Kenley and Purley and to stop a water treatment works which supplies tens of thousands of homes from flooding, Croydon Council said. The authority said the plan to use the underground footway to hold around 600,000 litres of water from tonight was approved after its "primary" pond at Purley Depot overflowed last night.