Vans RV-8 empennage kit, includes horizontal stabilizer, vertical stabilizer, elevators, and rudder, plus plans. 95% assembled, assembled by A&P mechanic, elevator with trim tab needs to be closed, interior skins and structural parts have been primed with Veri-prime epoxy primer.