Chevrolet S-10 T-5 Five Speed Good Transmission Electronic Speedometer on 2040-parts.com
New Albany, Indiana, United States
This is a Chevrolet S-10 T-5 five speed transmission, in excellent condition, ready to install. Your satisfaction is always guaranteed. This came from a 1990 S-10, bolts to a Chevrolet bell housing, and has an electronic speedometer. Perfect for a street rod project. People ask me to provide a tag number, and I can, but it is better to tell me what number you are looking for. I have either Chevrolet or Ford pattern (Used from 1992 up) for the bell housing boltup. Note, if you bid, I will end the auction immediately. We are fast shippers, and good at getting great rates. Questions? 800-850-6898, in and out, 502-493-8523, nights, 502-262-1212, cell. |
Complete Manual Transmissions for Sale
- Triumph tr2 tr3 tr4 tr4a tr250 tr6 1953-1976 transmission(US $300.00)
- Citroen sm maserati lotus esprit manual transmission 5 speed gearbox transaxle(US $2,500.00)
- Ford focus svt transmission 6 speed 02 manual getrag(US $250.00)
- Triumph spitfire 4 speed transmission 1962-1974(US $300.00)
- 06 impala automatic transmission 3.5l 1157088(US $600.00)
- 06 impala automatic transmission 3.5l 1157255(US $650.00)
McLaren F1 driver finds himself in hot seat
Tue, 02 Jun 2009The McLaren F1 is one hot supercar--literally, in the case of one of the 106 built. A McLaren was being driven in Santa Rosa, Calif., on Monday afternoon when the engine compartment caught fire. The car's owner, identified by the Santa Rosa Press Democrat as Irv Kessler, was driving.
Lamborghini LP620 YarroW
Sat, 31 Oct 2009The Lamborghini LP620 YarroW by Wheelsandmore The Lamborghini LP560-4 is a very good car. Not as barking mad as we like our Lambos – you can thank Audi for that – but a damn fine car nonetheless. Its stunning V10 makes one of the best noises on the planet and – unlike most chop-tops – the Spyder is as good as the coupe.
Detroit Electric delays SP:01 EV
Mon, 03 Jun 2013Detroit Electric will delay the SP:01 EV roadster for at least a month, according to a company executive who talked to the Detroit News. The company still hasn’t finalized a manufacturing location in Wayne County. Production was scheduled to start in August, now it’s slated for September.