Find or Sell any Parts for Your Vehicle in USA

Clymer Suzuki Outboard Work Shop Repair Manual 2-225 Hp Dt 1985-1991 Marine on 2040-parts.com

AU $49.95
Location:

Strathfieldsaye, Victoria, Australia

Strathfieldsaye, Victoria, Australia
Condition:New Brand:Clymer Manufacturer Part Number:B781 UPC:024185755692

PRONTO PRODUCT DESCRIPTION

BRAND NEW genuine Clymer publication No.B781 covering Suzuki Outboards 2-225 HP including jet drives 1985 thru 1991 (Softcover 648 pages).

With over 70 titles, covering inboard, outboard, stern drive and diesel engines, Clymer Marine Repair Manuals manuals remain the #1 source for DIY maintenance, troubleshooting and repair. With step-by-step procedures combined with detailed photography and extensive use of exploded views, Clymer manuals are a must-have tool for the do-it-yourselfer.

Models:
1985-1991 SUZUKI DT 100
1985-1991 SUZUKI DT 100 SUPER FOUR
1985-1991 SUZUKI DT 115
1985-1991 SUZUKI DT 140
1985-1991 SUZUKI DT 15
1985-1991 SUZUKI DT 150
1985-1991 SUZUKI DT 150 SUPER SIX
1985-1991 SUZUKI DT 175
1985-1991 SUZUKI DT 2
1985-1991 SUZUKI DT 20
1985-1991 SUZUKI DT 200
1985-1991 SUZUKI DT 200 EXANTE
1985-1991 SUZUKI DT 225
1985-1991 SUZUKI DT 25
1985-1991 SUZUKI DT 30
1985-1991 SUZUKI DT 35
1985-1991 SUZUKI DT 4
1985-1991 SUZUKI DT 40
1985-1991 SUZUKI DT 55
1985-1991 SUZUKI DT 6
1985-1991 SUZUKI DT 65
1985-1991 SUZUKI DT 75
1985-1991 SUZUKI DT 8
1985-1991 SUZUKI DT 8 SAIL
1985-1991 SUZUKI DT 85
1985-1991 SUZUKI DT 9.9
1985-1991 SUZUKI DT 9.9 SAIL
1985-1991 SUZUKI DT 90

 

Contents:
CHAPTER ONE / GENERAL INFORMATION
Manual organization / Notes, cautions and warnings / Torque specifications / Engine operation / Fasteners / Lubricants / Gasket sealant / Galvanic corrosion / Protection from galvanic corrosion / Propellers

CHAPTER TWO / TOOLS AND TECHNIQUES

CHAPTER THREE / TROUBLESHOOTING
Operating requirements / Starting system / Lighting system / Charging system / Ignition system / Breaker-point ignition component testing (1985-1989 DT 2) / Transistorized ignition system (1990-on DT 2) / Pointless electronic ignition (PEI) component testing / Integrated circuit (IC) and Micro Link ignition systems / Fuel system (carbureted models) / Engine temperature and overheating / Engine

CHAPTER FOUR / LUBRICATION, MAINTENANCE AND TUNE-UP
Lubrication / Storage / Complete submersion / Anti-corrosion maintenance / Galvanic protection and bonding wires / Engine flushing / Tune-up

CHAPTER FIVE / TIMING, SYNCHRONIZATION AND ADJUSTMENT
Engine timing and synchronization / Timing adjustment / Throttle adjustment / Throttle valve sensor adjustment / DT 225 EFI

CHAPTER SIX / FUEL SYSTEM
Loss of high speed rpm (all DT 15) / Off idle lean conditions (1988 DT 30 and 1989 DT 65) / Fuel pump and filter / Carburetor removal/installation / Carburetor overhaul/adjustment / Throttle plunger carburetor (DT 2) / Centerbowl carburetor (DT 4, DT 6; 1985-1987 DT 8) / Integral fuel pump carburetor (1988-on DT 8; 1985-on DT 9.9, DT 15) / Centerbowl single -throat carburetor (DT 20 through DT 85; DT115, DT140) / Centerbowl dual-throat carburetor (V4 and V6) / Carburetor cleaning and inspection / Reed valve assembly / Fuel tank / Fuel line, connector and primer bulb / Fuel injection system (DT 225 V6)

CHAPTER SEVEN / ELECTRICAL SYSTEMS
Electrical connectors / Battery / Lighting system (1985-1986 DT 9.9, DT 15, DT 40) / Battery charging system / Electric starting systems / Starter motor / Magneto breaker point ignition (1985-1989 DT 2) / Breakerless transistorized ignition (1990-on DT 2) / PEI ignition / Integrated circuit (I.C.) ignition system / Micro Link ignition system (V4 and V6) / Ignition coil (all models) / CDI unit (all models)

CHAPTER EIGHT / POWER HEAD
Engine serial number / Fasteners and torque / Flywheel / Power head

CHAPTER NINE / GEARCASE
Propeller / Water pump / Gearcase / Propeller shaft clutch / Pinion gear depth and forward/reverse gear backlash / Pinion gear adjustment (1986-on DT 115, DT 140; V4 and V6) / Propeller shaft end play (DT 8 through DT 65 models only) / Clutch pushrod dimension

CHAPTER TEN / AUTOMATIC REWIND STARTERS
Bendix starter / Overhead starter / Adjustment

CHAPTER ELEVEN / POWER TRIM AND TILT SYSTEM
Hydraulic pump / Troubleshooting / Pump oil pressure test / Component replacement

CHAPTER TWELVE / OIL INJECTION SYSTEM
System components / Operation / Low oil level warning light and buzzer / Oil flow sensor / Air/oil mixing valve / Oil pump service / Component replacement

CHAPTER THIRTEEN / JET DRIVES
Maintenance / Water pump / Jet drive / Bearing housing / Intake housing liner

INDEX

WIRING DIAGRAMS



PRONTO DOMESTIC POSTAGE

***GUARANTEED NEXT DAY DISPATCH***

Pronto uses a regular post delivery (4-6 day service) with a flat fee of $9.95 Australia Wide.

An express post option is also available for $13.95 (3 KG Satchel) Australia Wide.

Combine shipping with multiple items at no extra cost!

All products are sent to your address supplied in eBay checkout, simply complete the eBay checkout process.

 

PRONTO INTERNATIONAL POSTAGE

Pronto uses eBay's international postage calculator to ensure that you only pay for actual postage cost from Australia Post depending on your location.

All products are sent to your address supplied in eBay checkout, simply complete the eBay checkout process. 

To calculate postage simply click the 'Postage and payments' tab, select your country and click 'get rates'.

 

Postage cost varies depending on your country and delivery service chosen:

AIR  MAIL Worldwide (2 to 3 weeks delivery by Australia Post)

 


PRONTO PAYMENTS

3 payment options are available, please choose carefully as dispatch times vary.

1 - PAYPAL 1 business day

2 - DIRECT DEPOSIT 2-3 business days (depends on banks clearing times)

3 - MONEY ORDER / PERSONAL CHEQUE approx 1-2 weeks (depending on when payment arrives & clears)



2013 Ford Mustang Shelby GT500 to appear at Goodwood

Thu, 28 Jun 2012

On Wednesday we told you about the Mazda MX-5 GT concept that will be featured at the Goodwood Festival of Speed. On Thursday, Ford announced that its new Mustang Shelby GT500 will be taking a turn on the famous hillclimb circuit as well. Goodwood will be the GT500's first appearance outside of the United States.

It's (almost) alive: General Motors and NASA develop a humanlike robot for the International Space Station

Wed, 14 Apr 2010

General Motors and NASA have teamed up to develop Robonaut 2, which will be the first humanlike robot to take up permanent residence on the International Space Station. Known as R2, the 300-pound robot will use its “hands” and “arms” to utilize the tools of the station. It will assist astronauts, which GM says has parallels with helping its workers in factories.

London F1 Grand Prix plans completely serious, says Ecclestone

Fri, 13 Jul 2012

F1 boss Bernie Ecclestone says the recent publicity stunt by Santander for a London F1 Grand Prix are in fact a serious proposal. We recently saw plans for an F1 Grand Prix in London surface as something of a publicity stunt for Santander, with an impressive video (below) featuring McLaren’s Lewis Hamilton and Jenson button. The start of the London F1 Grand Prix is envisaged at Buckingham Palace and takes in the Mall, The Embankment, Trafalgar Square, Piccadilly Circus and a host of London’s iconic landmarks in a Grand Prix at night expected to attract hundreds of thousands of visitors.