Find or Sell any Parts for Your Vehicle in USA

Falcon Steering Systems Fk447 Sway Bar Link Kit on 2040-parts.com

US $2.95
Location:

Clearwater, Florida, US

Clearwater, Florida, US
Returns Accepted:Returns Accepted Refund will be given as:Money Back Item must be returned within:30 Days Return policy details:RETURN POLICY: ALL RETURN SHIPPING WILL BE PAID BY THE BUYER The buyer is responsible for return shipping, import duties and local taxes. Refund for shipping will be given if parts are defective, boxed wrong, or damaged in shipping. Part must be returned within 30 days. Returns will receive refund or replacement. New returns need to be in the original package, complete, and not damaged or installed. RGA are need on all returns: Call 727-446-8484 Returns need our RGA (return goods authorization) number on the box with a copy of your original invoice or eBay transaction number. Refunds can take up to 4 days after we receive the part. Return shipping will be paid by:Buyer Restocking Fee:No Part Brand:FALCON STEERING SYSTEMS Manufacturer Part Number:FK447 SME:_3278 Placement on Vehicle:Front

Geneva Motor Show 2007 - Preview

Fri, 02 Mar 2007

The 2007 Geneva Motor Show opens its doors with the media preview days starting March 6th. This year's show is set to be a vintage year for production models with a small cars such as the new Renault Twingo, Mazda2 and Skoda Fabia all being launched. Further up the scale, both Ford and Fiat will show replacements for key models - the third generation Mondeo and stunning new Bravo respectively.

Smart Fortwo Lightshine launches

Wed, 12 Jan 2011

Yet another Smart Limited Edition - the Smart Fortwo Lightshine You have to hand it to Mercedes – they don’t give up on Smart (or Maybach – another expensive departure). They keep churning out new cars (well, endless new limited editions, anyway) despite sales that seem to keep falling. Last year (2010) saw Smart sales in the UK fall by 8.5% and their sales last month (December 2010) were a woeful 57% down on December 2009.

Green Light For More Smart Motorway Schemes

Wed, 09 Jul 2014

THE Government has announced plans to speed up journey times on selected parts of the nation’s motorway network. As a result, work will start to convert the hard shoulder into a running lane on two sections of the M1 and on a stretch of the M3. The M1 work will be between junctions 28 and 31 in Derbyshire and between junctions 32 and 35a in South Yorkshire, with claims that it will boost capacity by up to a third and improve journey times by up to 10%.