Fastmount Vl-03 Very Low Profile Set Of 100 / Vl-cp 10 Pieces on 2040-parts.com
San Diego, California, United States
Fasmount panel clip system.
100 male and female VL-03 Very Low Profile 10 VL CP |
Service Tools for Sale
- Stevens peak voltage/dva meter cd-77 used(US $150.00)
- Cdi electronics spark tester 511-9766
- Omc 391012 2 jaw internal puller with 326002 slide hammer(US $50.00)
- Omc 319929 kent moore j24694 special dealer tool installer johnson evinrude(US $20.00)
- Omc 314718 kent moore j22798-1 gauge shimming tool stringer(US $30.00)
- Omc 334999 bearing installer special dealer tool johnson evinrude(US $12.50)
Kia GT4 Stinger concept (2014) first official pictures
Tue, 14 Jan 2014By Damion Smy First Official Pictures 14 January 2014 09:00 Kia has shown its first rear-wheel drive sports car at the Detroit motor show. The GT4 Stinger was shown to the press as the brand’s potential rival for the Toyota GT-86 and Subaru BRZ. The GT4 Stinger is a 2+2, front-engined coupe powered by a 311bhp 2.0-litre turbocharged four-cylinder petrol engine taken from Kia’s Optima racecars.
New Audi RS6 to get 572bhp V8
Sat, 04 Aug 2012The 2013 Audi RS6 looks set to swap its V10 for the new Audi V8 with the wick turned up to 572bhp – the same as the old V10. Most of the new A6 range has now arrived in showrooms – including the S6 and Avant – but what’s still missing is a new RS6, the Audi that used to have the heart of a Lamborghini. But as we reported in April, the 2013 RS6 is well on the way but it will be losing its Lamborghini V10 with its 5.2 litres and 572bhp and will instead get the Audi/Bentley twin-turbo 4.0 litre V8.
Call for reform over road repair funding
Fri, 06 Jun 2014FUNDING patterns mean most road maintenance is being carried out in "less-efficient, cold and wet" times, a report from a Government spending watchdog has said. The current pattern of funding, combined with the need to spend money within the financial year, means that most maintenance work goes on between September and March, said the report from the National Audit Office (NAO). It went on: "Although this is less disruptive for road users, it is less efficient than carrying out the work at other times of year because materials can be more difficult to handle in cold and wet conditions, and daylight hours are shorter." The report went on: "As a result of the additional funding for emergency repairs, which is made available at the end of the financial year, almost all highways authorities need extra capacity from the market at the same time, which makes it less likely that they will get value for money." The NAO report said there was a "lack of predictability" over road spending adding that historically, local highway authorities spent more revenue on maintenance, but were now carrying out fewer routine activities such as clearing gullies which are essential to preventing water seeping into roads' sub-structure.