Find or Sell any Parts for Your Vehicle in USA

Holley 390 Carburator on 2040-parts.com

US $30.00
Location:

El Centro, California, US

El Centro, California, US
Returns Accepted:ReturnsNotAccepted Brand:HOLLEY Manufacturer Part Number:390 CFM Warranty:No

  HOLLEY 390 CARBURATOR:

CLEAN GOOD CONDITION, EVERYTHING MOVES FREE, IT WILL REQUIRE KIT FROM SITTING, WAS RUNNING ON FLATHEAD FORD, RAN GOOD HAD CHOKE HORN MILLED OFF, THERE ARE NO JETS IN IT, I WAS  RUNNING 52  JETS FRONT AND REAR.

CALCULATE SHIPPING: EL CENTRO, CA 92243, 15 LBS

MG TF LE500 production scheduled

Thu, 08 May 2008

By Ben Pulman Motor Industry 08 May 2008 13:12 Another twist in the will-they-won't-they MG TF saga. The company has announced that production of the roadster will start again at Longbridge from early August 2008, and cars will be in dealerships by September. The first 500 cars off the Longbridge line will be the limited-edition, high-spec LE500.

CAR's guide to the 2008 Goodwood Festival of Speed

Wed, 09 Jul 2008

By Tim Pollard (photos by James Mann) Motor Shows 09 July 2008 12:11 Click here for CAR's full guide to the 2008 Goodwood Festival of Speed. Read our latest blogs, galleries, news – and even weather reports – live from Lord March's driveway. We're having daily updates to bring you all the news: • DAILY BULLETINWe're uploading daily reports live from the Festival of Speed, with news and pics• BLOGSSee how Ben Barry got on driving a Nissan GT-R up the hill on Friday• PREVIEWFull lowdown on what to expect at the 2008 Festival of Speed• CARS TO SEERound-up of the supercars, racing cars and even Bond cars at Goodwood• STARS TO SEEThe big names from the world of motorsport and beyond• PRACTICAL INFORMATIONHow to get there, links, maps, prices.

BID TO SLOW TRAFFIC ON M3 STRETCH

Fri, 14 Feb 2014

FIRST it was a stretch of the M1 and now the same speed reduction plan has been announced for a stretch of the M3 motorway in Surrey and Hampshire. The Highways Agency (HA) has proposed that a three-mile section of the M3 between junction 3 at Lightwater in Surrey and junction 4 near Farnborough in Hampshire be subject to a 60mph restriction. This section is part of a 13.4-mile stretch that is being upgraded in a £174 million scheme, with the 60mph proposal, to operate between 7am and 7pm daily so air quality levels can be met.