Iron Rock Off Road - Critical Path Rear Long Arm Upgrade - Jeep Wj (99-04) on 2040-parts.com
Shakopee, Minnesota, US
Lift Kits & Parts for Sale
- Rough country tj 4" x-series long arm suspension - iron rock off road(US $1,599.95)
- Iron rock off road - 99-04 jeep grand cherokee - wj 4" long arm lift kit (US $1,349.99)
- Iron rock off road - new - xj (84-01) cherokee 5.5" suspension lift kit(US $1,349.99)
- Iron rock off road -rough country coil springs 9275 multiple applications(US $99.99)
- 2007-2014 jeep wrangler 2 door 3" stage 3 lift kit fox racing shox mopar oem(US $2,400.00)
- Trailmaster cl220 front leveling kit chevrolet/gmc fire sale(US $73.69)
Volkswagen Touareg R50
Mon, 15 Oct 2007By Ben Pulman Motor Shows 15 October 2007 12:42 Let me guess…some fuel-guzzling, turbocharged behemoth? It might be a diesel, but yes, it’s still all of the above. Ths is VW’s new R50 and it’s the latest car from VW Individual, the same engineering group responsible for the Golf R32, Passat R36, and the Bluemotion range, including the Polo.
AAA to deploy fast-charging trucks for stranded EV drivers
Wed, 22 Jun 2011The American Automobile Association plans to use fast-charging trucks to help electric-vehicle drivers who get stranded when their car battery runs out. AAA will begin testing the trucks starting in August, the group told Bloomberg. At first, there will be six "mobile charging units" stationed in California, Oregon, Washington, Florida, Tennessee and Georgia.
Volvo celebrates the seatbelt’s golden anniversary
Wed, 12 Aug 2009By Freddie Fulton Motor Industry 12 August 2009 10:11 Today marks the 50th anniversary of the three-point seatbelt. It was patented by Volvo engineer Nils Bohlin in 1959, but the Swedes magnanimously opened up the tech to other car makers as they saw the real-world safety benefit of seatbelts in all cars. The design was so effective that in Germany the patent registrars listed it in the top eight inventions which have made an impact from 1885 to 1985.