Iron Rock Off Road - Zj 7" Critical Path Long Arm Kit 93-98 on 2040-parts.com
Shakopee, Minnesota, US
ZJ 7" Critical Path Long Arm Kit
We use an exclusive, non-binding, 3 link setup that has a pair of front long arms that will flex more than you thought possible. The bushings at the unibody are greasable and pivot to allow as much suspension travel as the long arms will allow. We combine it with heavy duty adjustable rear upper and lower control arms that are built to withstand whatever you can dish out. As always, this kit is 100% bolt on! NO WELDING OR CUTTING*and only minor drilling is required for installation. Our unique caster adjustment bracket allows 7.5° of adjustability, giving you the easiest installation of any long arm kit available! You can even keep your stock LCA mounts on the uniframe if you want.
The question that has you all wondering right now is, "Why did they make a front only long arm kit for a ZJ?" The answer is, we did it for a couple of reasons. 1. We wanted to offer a long arm kit to the public that could be affordable and appealing to the growing group of off road enthusiasts wheeling their ZJ's. 2. Our real world tests have shown dramatically increased wheeling ability with this kit installed, even without a rear long arm system. The XJ crowd has known for a long time that "front only" long arm kits allow them traction that would never be possible otherwise..... and that's with leaf springs in the rear!
Articulation is amazing with this kit. You will easily use the complete travel your shock absorbers allow. For the maximum shock length, choose the DT8000's and add some bar pin eliminators in the front of your ZJ! Capability versus stock is unbelievable. Not only are you 7" + tire size higher off the ground, but you have a suspension designed to conform to boulder strewn trails. Keeping your tires on the ground always equates to more traction, even without lockers. Traction is the key to off road capability, and you'll have a ton with this suspension. Clearance is important in so many ways, we sometimes forget what it does for us. We're not just talking about the extra 7" the new coils will give you, but the other clearance sensitive parts too. The front long arms are designed to fit without tire interference up to 37"+ (tested thoroughly with 37x12.5x17 Goodyear MT/R tires on 17x8 wheels with 4" backspacing on 7" lift). That means you can turn lock to lock in any suspension position without fear that your tires will rub on the control arms. Didn't think that was possible with 37's, did you? The front subframe gains roughly 2" of ground clearance over the factory transmission crossmember!! A better breakover angle results and greatly reduces the possibility of high-centering. The front long arms are mounted as high as possible in the subframe so they are also super high clearance. NOTE: 37" tires requires major fender trimming. Our tests were to conclusively prove that 37" tires will clear the control arms when turning. We recommend 35" tires with this suspension kit (with trimming). Streetability is always important to our design process. This suspension had to feel and perform immaculately on the street before we gave it our stamp of approval. Even at 7" of lift you'll be completely impressed with the ride as you're cruising the interstate at 70 mph. Durability makes this kit shine. Every part we manufacture is strong enough to hold up to anything you put in front of it. We use high quality thick wall D.O.M. and cold rolled solid steel for our control arms and track bars. All our subframe and bracket material is precision laser cut and formed from 1/4" steel plate. Needless to say, it's built to withstand a lifetime of abuse. We guarantee it.
That pretty much sums it up. This is the one off the shelf kit that will offer you all of these things and more in one complete package. Try to find another kit that will give you even close to the same overall performance. Seriously compare this kit to anything else out there.
INSTALLATION NOTES:This kit is 100% bolt on!! Strength is not compromised with this value added design feature. However, for those of you still concerned about strength, you can weld the subframe in or bolt AND weld them in (welding to the uniframe is complicated and should be done by an experienced professional welder). The choice is yours. The front subframe is assembled from 3 pieces. This will allow you to remove the center section for transmission/t-case access while leaving the front suspension (long arms) installed. If your ZJ has the CV (with rubber boots) front driveshaft, you will need to convert to the double cardan style to accommodate the lift height. Your rear driveshaft will work with this kit but a slip yoke eliminator is recommended. We do offer a heavy duty SYE for the 231 transfer case and a hack-n-tap SYE for the 231 and 242. Using a slip yoke eliminator has been proven to reduce and/or eliminate vibrations that may occur with taller lifts.
Kit Includes:
Front and rear coil springs
Front high clearance subframe assembly
Front long arm system with Iron Y Rear
heavy duty ADJUSTABLE upper and lower control arms
Heavy Duty Double shear track bar conversion (front)
Heavy Duty Rear adjustable track bar
Front and rear shock absorbers
Heavy duty extended front sway bar links
Rear extended length sway bar links
Extended length stainless steel brake hoses
Coil spring retainers Drop pitman arm
All necessary hardware
Installation instructions
Adjustable length long arms are available upon request for an additional $100. Please allow up to 3 weeks for the adjustable version as they are built to order.
We will need to know if you have the 2 hole or the 4 hole transmission mount in order to get you the correct subframe.
IMPORTANT INSTALLATION NOTE: It is becoming quite common to swap a High Pinion Dana 30 from an XJ Cherokee into the ZJ to improve both driveshaft angles and strength. If you have swapped, or plan on doing this swap at the time you are installing your long arms, you will need to let us know. The reason for this is because the XJ and ZJ front axles DO NOT have the same mounting positions for the control arms. The ZJ long arms WILL bolt up to the XJ axle, but you will not have a desirable range of caster adjustment. Therefore, the ideal solution is to use the XJ long arms when you are also using the XJ High Pinion Dana 30 axle. Check the appropriate box above to tell us that you will need the XJ arms.
International Shipment Available! There will be extra freight charges for international shipments, Alaska, Hawaii, Puerto Rico and Canada. We need ALL of the following information in order to process your custom freight quote:
Name
FULL shipping address
City, State, Postal or Zip Code
Country
Email Address Please email us if you have any questions.Call us at (952)210-7185
Lift Kits & Parts for Sale
- Iron rock off road - 6" suspension lift kit for tj jeep wrangler (1997-2006)(US $1,049.95)
- Iron rock off road - stainless steel braided brake line kit for xj (84-01)(US $99.99)
- Iron rock off road - 3.25" suspension lift kit ,jk jeep wrangler (07-10) 2/4door(US $399.95)
- Iron rock off road - new 5.5" leaf springs for xj cherokee (84-01)(US $339.99)
- Rough country tj long arm upgrade kit - iron rock off road(US $899.95)
- Iron rock off road - tj 4" suspension lift kit (97-06) wrangler (US $599.99)
New Honda wagon spied testing before fall debut
Mon, 01 Jun 2009You need some cargo room, but you don't want an SUV, a minivan or a pickup. What to buy? Honda thinks it might have an answer in this wagon with a sporty, sloped roofline.
Huayra paves the way for Pagani sales in the U.S.
Tue, 15 Feb 2011The Pagani Huayra will pave the way for the Italian company to begin selling its cars in the United States later this year. Pagani Automobili said on Monday that the 700-hp Huayra will be sold through a network of dealers. But it did not say how many dealerships it would have, where they would be located and when sales would start.
Leaf Powers Ahead As Europe's Best-Selling Car Vehicle
Thu, 13 Feb 2014THE NUMBERS are in and, while recent months have seen a flurry of new electric car launches, one car reigns supreme in this emerging sector. With a record-breaking 2013 behind it, Nissan’s Leaf topped the charts in Europe with 11,120 sales – a massive 204 percent rise compared to 2012. Furthermore Nissan is keen to point out that the Leaf is head and shoulders above its nearest rivals, achieving 25 percent more sales than its closest competitor.