Keychain Buell Xb12x Yb 12x Free Shipping! on 2040-parts.com
Ashton, Illinois, US
Other Merchandise for Sale
- New dynojet kawasaki zx-10r 11-13 power commander v ex,(US $317.02)
- Moose racing ktm 250 most,2250xcfwe,300(see listing) forged shift lever,orange(US $34.95)
- New pirelli diablo scooter performance sport tire tire-front, black, 120/70-12(US $61.84)
- Saddlemen sport sissy bar/combo bag ftb1000 saddlebags,black,19"w x15.5"h x10" d(US $79.48)
- New motion pro combo y-drive wrench wrench, chrome,(US $17.45)
- New moose racing kxf250 04-08 forged shift lever, green,(US $34.95)
Hyundai i30 three-door Paris 2012 Debut
Fri, 14 Sep 2012Hyundai has revealed the three door version of the new i30 ahead of a debut at the 2012 Paris Motor Show. The new Hyundai i30 range continues to grow with the i30 3-door joining the 5-door hatch and i30 Tourer, and bringing with it a more stylish look. The 3-door i30 – we want to call it the i30 Coupe – gets a sharply-raked beltline and a more angular glasshouse with longer front doors, and looks a lot more sleek than its five-door sibling.
Range Rover Evoque top financed luxury car
Wed, 22 Aug 2012A top luxury car finance house has revealed that the Range Rover Evoque is now the most popular financed car. Land Rover is still struggling to keep up with demand for the Range Rover Evoque, and is busy recruiting like mad and moving production to a 24hr, three shift system to help keep up with the number of Evoques flying out of showrooms. In the first year on sale, the Evoque racked up sales of 18,000 and so in demand is the Evoque that Land Rover are even resorting to trying to block grey market sales.
Webinars: RTT Realtime Design & Engineering Reviews
Wed, 06 Apr 2011Car Design News hosted Realtime Design & Engineering Reviews Using High-End 3D Visualizations with RTT on April 6, 2011. This particular webinar explored how Virtual Reality is becoming increasingly important in the product development process. Thanks to new visualization and simulation, technologies are minimizing dependence on physical prototypes, which in turn create massive cost and time savings.