Manual Shift Knob With Chrome Trimmed Boot Base For Vw Mk4 Golf Jetta 5 Speed on 2040-parts.com
Hong Kong, HK
- Manual gear shift knob with chrome framed shift boot for VW MK4 Golf, Jetta
- Fabric leatherette boot included
- Quality product and brand new
Other Parts for Sale
- Flowmaster set of 2 tail pipe new natural chevy chevrolet camaro 15801(US $129.99)
- Pair of carbon fibre metal car door lock pins set fit for all bmw e86 interior(US $19.99)
- Subaru spt front lower chassis brace impreza wrx sti legacy(US $169.95)
- New redline synthetic oil 15w40 diesel motor oil (1) gallon(US $53.95)
- Wireless headphones & dvd remote for 2012 chevrolet tahoe(US $79.90)
- New gem emblem chrome dodge lancer audi rs6 kia sedona subaru gl bmw 328i 949(US $20.12)
ABT Sportsline introduces 700 hp Audi RS6 Avant
Thu, 14 Nov 2013Hot on the heels of their appearance at SEMA and their announcement to open a location in the U.S., the German tuning firm ABT Sportsline has unveiled two new versions of the Audi RS6 Avant, dubbed the ABT Power S and ABT Power. Apparently, ABT Sportsline felt that the 560 hp output of the stock 4.0-liter TFSI-engined Audi RS6 Avant wasn't enough, and tuned the ABT Power S version to produce 700 hp. That's a 25 percent increase in power over the stock version.
Mini cleans up its act
Sun, 03 Jun 2007By Tim Pollard First Official Pictures 03 June 2007 02:33 Minis clean up Mini today announced it will fit many of the Efficient Dynamics tech already seen on the 1-series to all new hatchbacks fitted with the new PSA engines. The result? A Cooper D will now emit just 104g/km of CO2 - matching the signficantly more expensive Toyota Prius.
GM to double size of battery lab
Mon, 12 Apr 2010General Motors says it will spend $8 million to double the size of its Global Battery Systems Lab, which the company claims is the largest and most technologically advanced automotive battery lab in the United States. GM says the expansion will speed up the development of hybrid and electric vehicles, such as the upcoming Chevrolet Volt, by improving on-site testing of battery cells and systems. When finished, the lab will be 30,000 square feet bigger than it is now, for a 63,000-square-foot total.