New Genuine Eccentric Bolt - Control Arm (12 X 1.5 X 81 Mm), 33 32 6 863 853 on 2040-parts.com
Los Angeles, California, United States
Caster/Camber Kits for Sale
- Skunk2 racing skunk2 516-05-5660 pro series front camber kit for honda civic(US $271.16)
- Pair of maximum motorsports ford mustang support brackets cc-425.2 d&p s550 cc(US $100.00)
- New replacement alignment caster/camber kit, 72669(US $354.12)
- New replacement alignment cam bolt kit, 72439(US $22.74)
- Spc performance rear adjustable camber arm for 03-08 nissan 350z infiniti g35(US $99.99)
- Spc adjustable rear camber arm for 2006-15 honda civic si / 13+ acura csx/ilx(US $129.99)
Tesla Model S: First customer cars in June
Fri, 11 May 2012Tesla Model S - deliveries start in June Tesla Motors will deliver the first customer Tesla Model S cars to customer in the US in June as Tesla finally hits the make or break point. The Tesla Model S has been a long time coming, but Tesla now say that the first Model S cars will start to arrive with customers in the US in June, slightly ahead of schedule – which must be a first for Tesla. The first 1,000 deliveries will be of the range-topping Signature Series cars which come with the big 85kWh battery pack and lots of toys and cosmetic embellishments, but after that it’s regular Model S deliveries, although the cheaper versions with smaller battery packs and lower range won’t arrive until later.
Ferrari FF (2011) at 2011 Geneva motor show
Fri, 04 Feb 2011This, believe it or not, is the new Ferrari FF – it’s the Prancing Horse’s replacement for the Ferrari 612 Scaglietti. FF stands for Ferrari Four, to designate that this new GT features both four seats and Ferrari’s first ever four-wheel drive system. Why has Ferrari built this car?
GM stops Chevy Volt production to trim inventory
Fri, 02 Mar 2012General Motors will idle the Detroit-area assembly plant that builds the Chevrolet Volt for more than a month to curb rising inventories of the plug-in hybrid. On March 1, GM told 1,300 workers at its Detroit-Hamtramck assembly plant in Michigan that it will shut down production for five weeks, starting the week of March 19. GM plans to resume production on April 23, spokesman Chris Lee said.