Nitrous Express Direct Port Fogger Kit on 2040-parts.com
Lansing, Illinois, United States
Nitrous Express part number 90006-10. All brand new in boxes. Never opened!
|
Nitrous & Parts for Sale
- Nitrous wet kit/system(US $400.00)
- Aem recirculation-style water/methanol injection pump 30-3015 200psi(US $134.06)
- Mustang 5.0l nitrous express (nx) 10lb kit gt 40 plate
- Arc nitrous heater plate for arc nitrous brackets
- Replacment for nitrous express heavy-duty fuel pressure safety switch 15708(US $26.99)
- Nitrous express 4150 gemini twin stage 6 (50-300hp) kit w 10lb bottle used(US $700.00)
Maybach 57S Coupe arrives
Mon, 04 Oct 2010The Maybach 57S Coupe by Xenatec Regular readers will know that we gave due warning back in March that Maybach was going to be allowed to wither on the vine rather than get new models, apart from a run-out Maybach Coupe based on the Maybach 57S and ‘produced’ by German firm Xenatec. Mercedes refuted our story about the Maybach badge being allowed to die again soon after the story ran (although there were rumblings at Paris last week that Mercedes has lost patience with Maybach. We’ll see), but what we did get was an official announcement that there will indeed be 100 Maybach 57S Coupes built by Xantech and that they will costs a rather large €675,000.
Day 59 and counting for General Motors: Fritz says it like it is
Tue, 31 Mar 2009With less than two months remaining to determine its fate, newly christened General Motors CEO Fritz Henderson held a press conference Tuesday to show Wall Street and Washington that the buck stops with him. He did a creditable job. No, he did not remind viewers of Alexander Haig so much as he played the part of confident commander in charge.
Car manufacturing halted in Japan
Mon, 14 Mar 2011Nissan cars awaiting export wrecked by Tsunami In the wake of the devastating earthquake and Tsunami that struck Japan last week, the domestic car industry has ground to a halt. Honda, Toyota, Nissan and Mitsubishi have all now said they are halting all production until at least Wednesday in order to allow time to address damage, and to allow staff to make contact with family in affected areas. But it’s not just the damage to plants that’s the problem.