Find or Sell any Parts for Your Vehicle in USA

Nos Genuine Kawasaki Cylinder Base Gasket Kh400 Kh-400 S3 Mach Ii 74 75 76 77 78 on 2040-parts.com

US $9.99
Location:

Denver, Colorado, US

Denver, Colorado, US
Returns Accepted:Returns Accepted Refund will be given as:Money Back Item must be returned within:14 Days Return policy details:20% Restocking fee applies to all returns. No returns on electrical items, tools, manuals or hardware. Item must be returned undamaged with all original packaging. All returns require authorization. Please contact us for further assistance. Return shipping will be paid by:Buyer Restocking Fee:No Part Brand:OEM Genuine Kawasaki Manufacturer Part Number:11009-036 Model:KH400 KH-400 KH 400 S3 Mach II MachII Mach2

Components for Sale

Cars aren’t to blame for Global Warming – it’s down to fat people!

Tue, 21 Apr 2009

Being fat creates an extra tonne of Co2 emissions a year Much as I’m prone to warn against blindly believing the ‘Cars are destroying the Planet’ mantra we hear every day, it’s not me laying the blame at the feet of our chubby readers. The London School of Hygiene and Tropical Medicines has made the claim, for a variety of reasons, explained by Dr Phil Edwards who said “Walking around in a heavy body is like driving a gas guzzler”. But of course, that needs a little extra explanation to put it in to context.

Chevrolet Camaro V6 gets power boost from integrated exhaust manifold

Wed, 18 May 2011

General Motors has managed to wring out more horsepower from its 3.6-liter direct-injection V6 and get better fuel economy, too. And the 2012 Chevrolet Camaro gets the benefits. It starts with the old Lotus adage of adding lightness.

London underpass to hold flood water

Mon, 10 Feb 2014

A PEDESTRIAN UNDERPASS is to be turned into an emergency pond to hold hundreds of thousands of litres of floodwater threatening homes and businesses in south London. The Purley Cross underpass will be used to hold water pumped from around 400 under-threat buildings in parts of Kenley and Purley and to stop a water treatment works which supplies tens of thousands of homes from flooding, Croydon Council said. The authority said the plan to use the underground footway to hold around 600,000 litres of water from tonight was approved after its "primary" pond at Purley Depot overflowed last night.