Find or Sell any Parts for Your Vehicle in USA

P2m For Nissan S13/s14 V2 Short Shifter Kit P2-sskns240v2 on 2040-parts.com

US $76.50
Location:

Walnut, California, United States

Walnut, California, United States
Condition:New Manufacturer Part Number:P2-SSKNS240V2 Brand:P2M

 
Hosted by Use.com

Phase 2 Motortrend Inc.
377 S Lemon Ave Suite E
Walnut, CA 91789 USA
Tel: 909-594-3619
Brand: P2M
Part Number: P2-SSKNS240V2


Description:

P2M V2 shifter kit for KA24/SR20 is one step up from our V1 shifter.  The shifter can be considered as a race shifter that reduces shift throat by 50%.  The kit provides a solid shift feel and comes with a transmission shifter plate.  The shifter remained the same M10x1.25 shift knob thread pattern like stock.


Powered by eBay Turbo Lister
The free listing tool. List your items fast and easy and manage your active items.

Hyundai names former GM exec Shannon as U.S. marketing boss

Thu, 07 Apr 2011

Hyundai has tapped a General Motors veteran as its new U.S. marketing chief, filling a spot that has sat empty for more than seven months. Steve Shannon was named vice president of marketing for Hyundai Motor America on Wednesday and will officially take his position on April 18, Hyundai spokesman Chris Hosford said.

Volkswagen Beetle (2011) first official pictures

Mon, 18 Apr 2011

After 11 long years on sale the New Beetle is dead – its successor is this, The Beetle. We'll just call it the new 2011 VW Beetle. 2011 VW Beetle: trading flower-power for outlaw rodder Wider, lower and longer, the 2011 Beetle abandons its predecessors three semi-circle styling for the flat-roof look of 2005’s hot rod-inspired Ragster concept. At the front, the Beetle adopts the corporate horizontal intake styling and a more angular front bumper melded with a less curvaceous evolution of the 1998 New Beetle styling template.

Green Light For More Smart Motorway Schemes

Wed, 09 Jul 2014

THE Government has announced plans to speed up journey times on selected parts of the nation’s motorway network. As a result, work will start to convert the hard shoulder into a running lane on two sections of the M1 and on a stretch of the M3. The M1 work will be between junctions 28 and 31 in Derbyshire and between junctions 32 and 35a in South Yorkshire, with claims that it will boost capacity by up to a third and improve journey times by up to 10%.