Replace Fo1195116 - 2010 Ford Mustang Rear Bumper Valance Factory Oe Style on 2040-parts.com
Tampa, Florida, US
Bumpers for Sale
- Replace gm1000906v - 10-12 chevy camaro front bumper cover factory oe style(US $224.69)
- Replace fo1000398v - 96-97 ford taurus front bumper cover factory oe style(US $214.22)
- Replace ho1142105 - honda fit rear driver side bumper cover side bracket(US $6.66)
- Replace ho1100220v - 05-10 honda odyssey rear bumper cover factory oe style(US $273.42)
- Replace fo1087130 - 2001 ford e-series front bumper deflector filler oe style(US $73.34)
- Replace gm1070222ds - chevy cavalier front bumper absorber factory oe style(US $108.00)
Jaguar & Land Rover to share more platforms. But you already knew that.
Thu, 01 Nov 2012As Jaguar and Land Rover expand their model range and move to aluminium construction, they plan to share more platforms. Jaguar has been using an aluminium platform for the XJ for some time – long before the latest XJ came along. The aluminium platform the XJ uses is just the start for Jaguar Land Rover, as we reported back in 2009, and it seems that JLR are planning to use the move to aluminium underpinnings to cut their platforms to just two or three.
Ferrari 458 Italia – Schumacher speaks +video
Wed, 02 Sep 2009Michael Schumacher waxes lyrical on the 458 Italia in the video below. And to be honest, this video of Michael Schumacher extolling the virtues of the 458 Italia really doesn’t tell us any more. Michael talks about the new engine; the handling; the F1 inspired controls on the steering wheel.
Seat completes industry's largest solar panel installation
Mon, 25 Nov 2013SEAT HAS completed construction of the largest solar panel installation in the automotive industry. The huge 'Seat al Sol' array at the firm’s Martorell plant outside Barcelona is the size of 40 football pitches and generates 15 million kilowatt hours of power per year courtesy of the reliable Spanish sunshine. The electricity produced is enough to account for a quarter of the amount needed to build a year’s allocation of Leons, reducing the factory’s energy bills significantly and saving 7,000 tonnes of CO2 per year.