Seadoo 650 Engine Motor Cases Crankcase Brand New on 2040-parts.com
Fort Lauderdale, Florida, United States
This is a new set of cases for a 650 X engine for a 1995 Seadoo GTX XP SPX SPI GS GTI GTS.
|
Complete Engines (Watercraft) for Sale
- Yamaha vx110 crankshaft with flywheel(US $400.00)
- Polaris virage i 800 engine cylinder head 02 03 04 heads 3021205-244-03(US $25.00)
- Yamaha jet ski wave runner 1992 and 1993 500, 650cc
- Yamaha vx110 2005-2008 throttle lever wave runner vx 110 cruiser deluxe(US $17.98)
- Yamaha 65u motor 66h xl gp 1200 exciter 270hp ar lx210 ls2000 newrebuilt nocore(US $1,589.95)
- 2000 seadoo 717 motor(US $300.00)
2015 Ford Mustang front end spy shots
Mon, 07 Oct 2013The 2015, or 2014.5 depending on who you ask, Ford Mustang will go on sale next April, on the car's 50th anniversary. It will most likely arrive with four-, six- and eight-cylinder engines and for the first time an independent rear suspension. We've already seen a few spy shots of the next Mustang testing, but these pictures supplied by someone on the inside give us our first good look at the front end.
Volvo Concept Universe
Tue, 19 Apr 2011Taking center stage at the Shanghai Auto Show was the Volvo concept Universe. As the first project done under Peter Horbury since his return to Volvo, and new owner Geely the car marks a departure from current design languages and returns to simple Scandinavian design. "The Concept Universe offers the world a sneak preview of what people can expect from our next top-of-the-line sedan," says Stefan Jacoby, President and CEO of Volvo Car Corporation.
GM to double size of battery lab
Mon, 12 Apr 2010General Motors says it will spend $8 million to double the size of its Global Battery Systems Lab, which the company claims is the largest and most technologically advanced automotive battery lab in the United States. GM says the expansion will speed up the development of hybrid and electric vehicles, such as the upcoming Chevrolet Volt, by improving on-site testing of battery cells and systems. When finished, the lab will be 30,000 square feet bigger than it is now, for a 63,000-square-foot total.