Ski Doo Summit Mxz 700 00 01 02 03 Engine Motor Complete on 2040-parts.com
Kaysville, Utah, United States
This was removed from a running 2002 Summit 700. Sled had 2456 miles. Comes with what you see in pics. It looks like 1 exhaust bolt is broken.
|
Complete Snowmobile Engines for Sale
- Polaris indy 440; 1995 complete engine(US $499.99)
- Arctic cat wildcat 650; 1988 complete motor(US $599.99)
- Ski-doo formula 3 700 triple; 1998 motor/ engine(US $799.99)
- Complete yamaha 340 cdi-oil inj motor 82j-000878 out of 1987 excel iii sled(US $399.99)
- Vintage snowmobile service manual rupp yamaha suzuki ski doo kawasaki moto ski(US $45.00)
- Polaris 2001 xcsp 600 engine, 3218 miles, 120 p.s.i. comp., shipping available(US $1,099.00)
General Motors spending $131 million to upgrade Corvette plant
Wed, 04 May 2011General Motors is spending $131 million on its Bowling Green, Ky., assembly plant to prepare it to build the next-generation Corvette. The plant will spend the money on manufacturing equipment, specialized tooling and plant updates, said Mark Reuss, GM's president of North America. The plant will add about 250 jobs, which will boost its workforce by about 50 percent, to about 750 workers.
AutoWeek's Keith Crain receives Mercedes Star Driver award
Mon, 23 Aug 2010AutoWeek editor-in-chief Keith Crain recently received the Star Driver award from Mercedes-Benz, an honor that recognizes an individual who has made great contributions to motorsports and the automobile industry. Crain, shown at left with Geoff Day, director of communications at Mercedes-Benz USA, is the sixth recipient of the Star Driver honor. He joins the ranks of Sir Stirling Moss, John Fitch, Jochen Mass, Jesse Alexander and AutoWeek senior contributing editor Denise McCluggage.
Last Lexus LFA in Europe gets delivered
Tue, 26 Mar 2013The last Lexus LFA to be delivered to a European customer has now arrived with its owner in Switzerland bringing to an end the Lexus supercar adventure. It took another year for Lexus to start building the LFA at the Motomachi Plant, Aichi Prefecture and a further two years for the plant to finish building the 500 LFAs planned, with the last LFA being built in December last year. Despite the last LFA rolling out in December it’s taken until today for the last LFA bound for a European customer to be delivered, with its new owner taking delivery in Switzerland.