Wilwood 11.750 In Od Ultralite 30 Brake Rotor P/n 160-0790 on 2040-parts.com
Ocala, Florida, United States
Performance Brake Rotors for Sale
- Diversified machine 10.750 in od drilled brake rotor p/n src-2705(US $113.89)
- Strange 11.250 in od directional/slotted rear brake rotor p/n b2793(US $172.79)
- Wilwood 12.188 in od plain/scalloped ultralite 32 brake rotor p/n 160-8136(US $102.75)
- Wilwood 11.750 in od directional/plain hd 36 brake rotor p/n 160-12283(US $114.99)
- Wilwood 11.750 in od plain/scalloped ultralite 32 brake rotor p/n 160-8343(US $102.75)
- Wilwood 10.000 in od drilled standard mount brake rotor p/n 160-0867(US $98.19)
Toyota recalls Highlander and Lexus hybrids, IS and GS sedans
Wed, 04 Sep 2013Toyota announced two recalls on Wednesday that include 369,000 vehicles worldwide, 235,000 of which are in the United States. The hybrids have a problem with a transistor, while the 3.5-liter V6 is having problems with its variable valve timing control device. The first recall includes Highlander Hybrid models from 2006-2010 and the Lexus RX 400h from 2006-2008.
2011 Mercedes CL Facelift Goodwood Reveal
Fri, 02 Jul 2010The Mercedes CL 2011 bow is at Goodwood We had a peek a couple of weeks ago at the 2011 Mercedes CL facelift after a photo of the AMG version leaked out, but Mercedes has decided to get on with the job and have a proper reveal this weekend at the Goodwood Festival of Speed. And it this facelift for the Uber-Coupe will keep the CL moniker rather than changing to S Class Coupe as we expected. The big Mercedes Coupe is due in the UK by October and it gets the expected nip and tuck to keep it looking fresh.
BID TO SLOW TRAFFIC ON M3 STRETCH
Fri, 14 Feb 2014FIRST it was a stretch of the M1 and now the same speed reduction plan has been announced for a stretch of the M3 motorway in Surrey and Hampshire. The Highways Agency (HA) has proposed that a three-mile section of the M3 between junction 3 at Lightwater in Surrey and junction 4 near Farnborough in Hampshire be subject to a 60mph restriction. This section is part of a 13.4-mile stretch that is being upgraded in a £174 million scheme, with the 60mph proposal, to operate between 7am and 7pm daily so air quality levels can be met.