12' Trailer Plug And Wire Assy on 2040-parts.com
Martinsburg, West Virginia, United States
Plug and 12 foot of wire 14 gauge 7 conductor.Please check out my other auctions for related items
|
Other for Sale
- Boat rv caravan camper 360° turning cold hot folding kitchen faucet tap gr-s001(US $99.99)
- Camco 37002 flush mount fill spout (beige) - lead free(US $19.42)
- Ventline va0445-36 polar white 4-1/8" radius garnish(US $18.09)
- Dometic rv 3850712013 refrigerator power module board-new!-in stock-warranty(US $87.97)
- Prest-o-fit 2-0374 outrigger radius black rv step rug(US $32.51)
- Camco 55422 power grip 12" 30amp 4 prong locking male to 50amp standard female(US $55.74)
BMW 3-series Gran Turismo (2013) first official pictures
Thu, 07 Feb 2013This is the latest member of the BMW 3-series family: the taller, roomer 3-series Gran Turismo. BMW claims the 3GT is designed to give the dynamic handling of a saloon, the rakish looks of a coupe and more space than an estate. Has BMW found the Holy Grail, or is this a case of Jack of all trades and master of none?
Car sales rise as shutdown ends
Fri, 01 Nov 2013DETROIT -- Combined U.S. sales by the Detroit 3 rose 14 percent last month, helped by strong demand for sedans and pickups and an increase in showroom traffic after the partial government shutdown ended. General Motors reported a 16 percent gain after losing market share in August and September.
SAE approves new fast-charging standard for EVs, plug-ins
Tue, 16 Oct 2012SAE International said it has approved a new technical standard that will dramatically reduce charging times for plug-in hybrid electric vehicles and electric vehicles. The global engineering group said the new charging standard, developed with the cooperation of more than 190 automakers, utilities and equipment builders, will allow charging times to be reduced from as long as eight hours to as short as 20 minutes. Automakers want DC direct charging to take less than 10 minutes, or roughly the time it takes to fill a tank with gasoline.The goal is to accommodate currents as high as 500 volts distributed from public charging stations.