Find or Sell any Parts for Your Vehicle in USA

13437nos Nos Efi Nos Wet Plate - Gm on 2040-parts.com

US $289.95
Location:

KY, United States

KY, United States
Condition:New: A brand-new, unused, unopened, undamaged item in its original packaging (where packaging is applicable). Packaging should be the same as what is found in a retail store, unless the item was packaged by the manufacturer in non-retail packaging, such as an unprinted box or plastic bag. See the seller's listing for full details. See all condition definitions Brand:NOS Manufacturer Part Number:13437NOS UPC:090127003510

Public urged to give view on A9 plan

Fri, 01 Nov 2013

THE PUBLIC have been urged to have their say on the design of the most expensive road project in Scotland's history. The £3 billion upgrade of the A9, which runs from central Scotland to the north coast, to full dual carriageway will cost more than the M74 completion, the new Forth road bridge and the Aberdeen bypass combined. The first public displays setting out the logistical and environmental impact of the first £40 million section of the upgrade, from Kincraig to Dalraddy in the Highlands, will be unveiled this month.

U.S. will guarantee GM, Chrysler warranties, Obama says

Mon, 30 Mar 2009

In a bid to boost flagging auto sales, the federal government will pay for any warranty repairs on a General Motors or Chrysler vehicle if either company can't because of financial problems or a bankruptcy filing, President Barack Obama said on Monday. "Let me say this as plainly as I can. If you buy a car from Chrysler or General Motors, you will be able to get your car serviced and repaired just like always," Obama said in a speech.

Electric Renault to take on 2,000-mile Pod Point challenge

Wed, 04 Jun 2014

A RENAULT Zoe electric car is about to cover 2,000 miles up and down the country to prove that a linked and entirely functional network of electric charging points already exists. The full-electric supermini will take on challenges, attempt to break records and join in for loads of festivities throughout the 17-day grand tour, all using public electric charging points. What's more, Pod Point, the company behind the endeavour, will install more points wherever it thinks they're needed on its route around Great Britain.