Find or Sell any Parts for Your Vehicle in USA

1999-2005 Pontiac Grand Am Climate Control Switch Assembly on 2040-parts.com

US $15.00
Location:

Daingerfield, Texas, US

Daingerfield, Texas, US
Item must be returned within:14 Days Refund will be given as:Money Back Return shipping will be paid by:Buyer Restocking Fee:No Returns Accepted:Returns Accepted Return policy details: Brand:ACDelco Manufacturer Part Number:09377232 Placement on Vehicle:Front Surface Finish:see photos

1999-2005 Pontiac Grand Am climate control switch assembly, missing the blower position knob but everything was in working order when it was removed from a 2002 Pontiac Grand Am.

Park into the future in Los Angeles!

Thu, 20 Feb 2014

Parking is the lifeblood that keeps Los Angeles alive and its citizens moving -- and once they finish moving, they must find a place to stop. We define our relationships through parking. We memorize a byzantine code of 3R permits, metered parking, street sweeping times, two-hour-parking-8 a.m.-to-8 p.m.-except-Sundays, loading zones, taxi zones, fire lanes, bus lanes.

2014 Chevrolet Cruze Turbo Diesel to deliver 46 mpg on highway

Thu, 18 Apr 2013

General Motors said the 2014 Chevrolet Cruze Turbo Diesel will deliver an estimated 46 miles per gallon on the highway, besting the company's initial target by four mpg. The estimate is also good enough to top the rival 2013 Volkswagen Jetta diesel, which achieves 42 mpg on the highway. The Cruze's 2-liter turbo diesel engine produces 148 horsepower, compared with 140 hp for the Jetta diesel.

2013 New York F1 Grand Prix cancelled

Fri, 19 Oct 2012

The 2013 Grand Prix of America in New Jersey has been dropped as organisers run out of time to prepare for the New York street F1 event. With Bernie Ecclestone pushing to get America to fall in love with F1, a headline F1 act on the streets of New York – a Monaco GP for the colonials – looked like a plan. But it’s a plan that’s now been postponed until at least 2014 after Bernie plugged the plug on organisers as they need more time to prepare for what will, by any measure, be a huge logistical task.