Find or Sell any Parts for Your Vehicle in USA

2-13/16" Rudder Trim Tab Anode All Water Types Aluminum Fishing Boat Hardware on 2040-parts.com

US $22.15
Location:

Condition:New: A brand-new, unused, unopened, undamaged item in its original packaging (where packaging is applicable). Packaging should be the same as what is found in a retail store, unless the item was packaged by the manufacturer in non-retail packaging, such as an unprinted box or plastic bag. See the seller's listing for full details. See all condition definitions Brand:Performance Metals Manufacturer Part Number:R2813A UPC:870648000881

Jaguar Land Rover sorts its finance

Tue, 11 Aug 2009

Tata has secured £175 million private funding for Jaguar Land Rover But it is now being reported that JLR has managed to secure £175 million in private funding, obviating the need to succumb to Government interference in its business. Which has got to be good news for the JLR workforce – at least for now. Jaguar and Land Rover are very much on the up.

Ford Ka 1.3 Zetec TDCi: On the Drive

Tue, 16 Jun 2009

We review / road test the Ford KA 1.3 Zetec TDCi John Test Drives the Ford KA 1.3 Zetec The English language is a funny thing. We like to think that language is something that binds us. But actually  it divides us; classifies us; condemns us and pigeon-holes us.

Call for reform over road repair funding

Fri, 06 Jun 2014

FUNDING patterns mean most road maintenance is being carried out in "less-efficient, cold and wet" times, a report from a Government spending watchdog has said. The current pattern of funding, combined with the need to spend money within the financial year, means that most maintenance work goes on between September and March, said the report from the National Audit Office (NAO). It went on: "Although this is less disruptive for road users, it is less efficient than carrying out the work at other times of year because materials can be more difficult to handle in cold and wet conditions, and daylight hours are shorter." The report went on: "As a result of the additional funding for emergency repairs, which is made available at the end of the financial year, almost all highways authorities need extra capacity from the market at the same time, which makes it less likely that they will get value for money." The NAO report said there was a "lack of predictability" over road spending adding that historically, local highway authorities spent more revenue on maintenance, but were now carrying out fewer routine activities such as clearing gullies which are essential to preventing water seeping into roads' sub-structure.