Find or Sell any Parts for Your Vehicle in USA

2005 2006 Mercedes-benz R171 Slk350 3.5l V6 Air Intake Throttle Body on 2040-parts.com

US $56.67
Location:

West Sacramento, California, United States

West Sacramento, California, United States
Condition:UsedAn item that has been used previously. The item may have some signs of cosmetic wear, but is fully operational and functions as intended. This item may be a floor model or store return that has been used. See the seller’s listing for full details and description of any imperfections. See all condition definitions Seller Notes:“Pictures are of the item you will be receiving. We only guarantee fitment by part number, verify fitment with dealer and item condition before purchase. From 2006 SLK350 3.5L V6, Air intake throttle body.” Read Less Manufacturer Part Number:1131410125 Other Part Number:A1131410125 Brand:Mercedes-Benz Fitment Type:Direct Replacement Modified Item:No

Throttle Body for Sale

Audi Q5 Hybrid revealed +video

Tue, 09 Nov 2010

The Audi Q5 Hybrid gets revealed on the quiet I know, you’re thinking that Audi has decided to get some spoiler photos and powerplant details on the Audi Q5 Hybrid out in the open ahead of the Los Angeles Motor Show to spoil the normal leaks on a new model. But no, it’s a bit more peculiar than that. For some reason – and without fanfare or announcement – Audi has added details of the Q5 Hybrid to its websites.

General Motors to drop Goodwrench brand in the United States

Mon, 08 Nov 2010

UPDATED -- General Motors Co. is dropping the GM Goodwrench car mechanic brand in the United States as the company moves to redirect the marketing emphasis around its four core vehicle brands, the company announced. The long-standing Goodwrench brand--used by GM dealers to promote vehicle repair and maintenance services--will be replaced by Chevrolet Certified Service, Cadillac Certified Service, Buick Certified Service and GMC Certified Service, GM said in a statement released Monday evening.

No M4 relief road 'before 2020'

Thu, 07 Nov 2013

A "RELIEF ROAD" for the M4 in south Wales is unlikely to be constructed before 2020, a leading transport expert has told Welsh Assembly Members. A new stretch of motorway south of Newport could be back on the cards after the UK ministers announced the possibility of Welsh Government borrowing the money needed for the scheme. However the re-emergence of proposals to ease traffic on Wales' heavily congested western gateway prompted fierce debate during a committee hearing in the Senedd.