3m 02568 Coated Abrasive Sheets 2 3/4" X 17.5" 180 Gt Production Gold 13 Sheets on 2040-parts.com
Buckeye, Arizona, US
3M 02568 Coated Abrasive Sheets 2 3/4" x 17.5" 180 GT Production Gold 13 Sheets (13 Remaining in Box)
There is 13 Productio Fre-Cut Paper Gold Coated Abrasive Sheets remaining in this box
All of the sheets left in this box is NEW
I will be shipping this item through the USPS with Tracking. I also ONLY have 1-DAY handling to package and ship all of my items. Please feel free to contact me if you have any questions.
Body Shop Supplies for Sale
3m™ vinyl tape 471+, 1/4 inch x 36 yards, 06405/6405 new in package 12 available(US $9.25)
Stikit soft disc pad 8 inch 05568(US $50.25)
Eastwood automotive paint color chip chart(US $4.99)
Glaze-it finishing spot putty auto body filler-paint(US $37.99)
3m perfect it 3000 trizact spot finishing compound quart 06070(US $40.00)
Mig tig arc weld fiberglass welding blanket 4ft x 5ft(US $52.94)
Bentley Continental GT3: Official details (video)
Sat, 13 Jul 2013The Bentley Continental GT3 (pictured) is at Goodwood this weekend We actually had the reveal of the Bentley Continental GT3 at the Paris Motor Show last year, but at the time details and specifications were a bit thin on the ground, and Bentley were calling it a ‘Concept’. But now, with the Continental GT3 strutting its stuff at the Goodwood Festival of Speed and ready to play, Bentley has seen fit to tell us how much power the GT3 has, and how much weight it’s shed. Remarkably, the Continental GT3′s weight is a substantial 100kg less than the road-going GT, weighing it at an almost lightweight 1300kg.
Pforzheim University Winter Degree Show 2009
Thu, 12 Mar 2009Transportation Design students at Germany's Pforzheim University displayed their work in the school's summer degree show last month, one of two graduation shows held every year by the renowned college. The exhibition included work from graduating Diploma and Masters students, first- and second-semester Masters students, as well as exterior and interior projects by the fifth- and seventh-semester BA students. The newly introduced Bachelor course covers the Transportation Design program in seven semesters (replacing the eight-semester Diploma course) with students embarking on specialized transportation projects in their second semester.
Call for reform over road repair funding
Fri, 06 Jun 2014FUNDING patterns mean most road maintenance is being carried out in "less-efficient, cold and wet" times, a report from a Government spending watchdog has said. The current pattern of funding, combined with the need to spend money within the financial year, means that most maintenance work goes on between September and March, said the report from the National Audit Office (NAO). It went on: "Although this is less disruptive for road users, it is less efficient than carrying out the work at other times of year because materials can be more difficult to handle in cold and wet conditions, and daylight hours are shorter." The report went on: "As a result of the additional funding for emergency repairs, which is made available at the end of the financial year, almost all highways authorities need extra capacity from the market at the same time, which makes it less likely that they will get value for money." The NAO report said there was a "lack of predictability" over road spending adding that historically, local highway authorities spent more revenue on maintenance, but were now carrying out fewer routine activities such as clearing gullies which are essential to preventing water seeping into roads' sub-structure.



