Find or Sell any Parts for Your Vehicle in USA

Apollo Sl70 Transponder on 2040-parts.com

Location:

Fort Walton Beach, Florida, United States

Fort Walton Beach, Florida, United States

Working great when replaced by new panel.  Includes mounting tray. No damage.

Concours d'LeMons: Living a different kind of automotive lifestyle

Thu, 10 Sep 2009

The “winner” was perhaps the worst car I'd ever seen. The 1980 French KV Mini looked like something made in a backyard by a 10-year-old. This thing was not going to pass government standards in any country in the world.

Aston Martin DP-100 Vision Gran Turismo Concept revealed – Goodwood debut today

Fri, 27 Jun 2014

The Aston Martin DP-100 Vision Gran Turismo Concept As design technology has evolved, it’s become properly practical for car makers to indulge their design flair in cars that will only ever really exist in the virtual world. And the latest creation comes from Aston Martin with the reveal today of the Aston Martin DP-100 Vision Gran Turismo Concept. Developed in just six months by Aston Martin’s Design Team, the DP-100 Vision Gran Turismo boasts an 800bhp twin-turbo V12, is mid-engined (a first for Aston Martin) and, if it were real, would offer blistering performance.

Lamborghini CO2 reduction Press Release

Sun, 07 Jun 2009

Lamborghini CO2 Reduction Press Release • The construction of a large photovoltaic plant, combined with an energy-saving project, will achieve a 30% reduction in the factory’s CO2 emissions by 2010 • Modifications to vehicles will result in a 35% reduction in CO2 emissions by 2015 Automobili Lamborghini announces its intention to complete its program of environmental sustainability in record time by presenting new plans which will enable the company: The plans for reducing emissions will thus involve two areas: modifications to the Lamborghini factory in Sant’Agata Bolognese, and development in vehicle design. To redefine its industrial processes in accordance with its policy of environmental sustainability, Lamborghini has just begun a project to complete installation of a large photovoltaic system by the end of 2009. The roof-top plant will produce 1,582 Megawatt hour (MWh) of “green” energy per year, which translates into a 20% reduction in CO2 emissions (-1,067,820 Kg/year) by 2010.