Find or Sell any Parts for Your Vehicle in USA

Flowtech Afterburner Headers Full-length Silver Ceramic Coated 1 5/8" Primaries on 2040-parts.com

US $359.97
Location:

Tallmadge, OH, US

Tallmadge, OH, US
Returns Accepted:Returns Accepted Refund will be given as:Money Back Item must be returned within:60 Days Return policy details:Items may be returned within 90-days or purchase for a refund or exchange, if in new and unused condition. Return shipping will be paid by:Buyer Restocking Fee:No Other Part Number:BIG-49100-1FLT Surface Finish:Silver Ceramic Coated 18-Gauge Steel Brand:FLOWTECH Manufacturer Part Number:49100-1FLT UPC:787480491015

Exhaust Headers for Sale

Vintage racer Anatoly Arutunoff in serious but stable condition

Thu, 10 Feb 2011

Automotive enthusiast, vintage racer, rapscallion and country-boy bon vivant Anatoly Arutunoff is in serious but stable condition following an accident on Feb. 8 while reportedly being a Good Samaritan. Arutunoff, known as Toly to his friends, was on his way to the Sports Car Club of America convention in Las Vegas when he stopped to help a stranded driver along Interstate 40 in Amarillo, Texas.

Top Gear Three Wise Men cars off to Beaulieu

Mon, 27 Dec 2010

The Top Gear Three Wise Men Cars are now on display at Beaulieu That didn’t take long. Despite the Top Gear Christmas ‘Three Wise men’ Road trip only airing on the Beeb yesterday – and the whole Top Gear Iraq to Bethlehem episode only being filmed in October – it’s been revealed that the cars that starred in the Christmas Special have already found their way off to the World of Top Gear exhibition at Beaulieu. The whole ‘World of Top Gear’ at Beaulieu is a ‘must-see’ for the proper Top Gear anorak, with everything from a recreation of the Top Gear Studio – including the Cool Wall – to a collection of cars from some of Top Gear’s most ambitious challenges over the years.

GM stops Chevy Volt production to trim inventory

Fri, 02 Mar 2012

General Motors will idle the Detroit-area assembly plant that builds the Chevrolet Volt for more than a month to curb rising inventories of the plug-in hybrid. On March 1, GM told 1,300 workers at its Detroit-Hamtramck assembly plant in Michigan that it will shut down production for five weeks, starting the week of March 19. GM plans to resume production on April 23, spokesman Chris Lee said.