Find or Sell any Parts for Your Vehicle in USA

Front Steering Rack Detroit Axle 61nbcg68 For Dodge Grand Caravan 2010 2009 2008 on 2040-parts.com

US $138.79
Location:

Condition:New: A brand-new, unused, unopened, undamaged item in its original packaging (where packaging is applicable). Packaging should be the same as what is found in a retail store, unless the item was packaged by the manufacturer in non-retail packaging, such as an unprinted box or plastic bag. See the seller's listing for full details. See all condition definitions Type:Steering Rack Brand:Detroit Axle Part Number:61NBCG68 Placement on Vehicle:Front Fit Note:Rack and Pinion Assembly Manufacturer Warranty:12 Month Warranty Attention:PLEASE READ ALL NOTES TO CONFIRM FITMENT CS-SKU:400:61NBCG68 Manufacturer Part Number:61NBCG68

Steering Racks & Gear Boxes for Sale

Aston Martin flies the new Lagonda to Muscat with Oman Air

Fri, 29 Aug 2014

Aston Martin flies the new Lagonda to Muscat with Oman Air Back in July, Aston Martin confirmed the revival of Lagonda with a short run of a Lagonda Super Saloon to be sold exclusively in the Middle East. At that time, all we had was a dark photo showing the new Lagona’s silhouette but now, as Aston start to test the new Lagonda, we get a proper photo (above and below). The photo of the new Lagonda shows its arrival in Muscat – courtesy of Oman Air – as the new Lagonda is flown out to Oman to begin its testing.

Volkswagen Cross Coupe concept car (2011)

Wed, 30 Nov 2011

Volkswagen has revealed the Cross Coupe concept car crossover at the 2011 Tokyo auto show. At 4345mm long, it's roughly between Golf and Tiguan - suggesting the successor to the Tiguan could adopt a more Evoque-inspired stance. VW Cross Coupe: the lowdown This isn't just a conceptual look at future VW SUVs - it's also the first sight of the group's new MQB platform.

Call for reform over road repair funding

Fri, 06 Jun 2014

FUNDING patterns mean most road maintenance is being carried out in "less-efficient, cold and wet" times, a report from a Government spending watchdog has said. The current pattern of funding, combined with the need to spend money within the financial year, means that most maintenance work goes on between September and March, said the report from the National Audit Office (NAO). It went on: "Although this is less disruptive for road users, it is less efficient than carrying out the work at other times of year because materials can be more difficult to handle in cold and wet conditions, and daylight hours are shorter." The report went on: "As a result of the additional funding for emergency repairs, which is made available at the end of the financial year, almost all highways authorities need extra capacity from the market at the same time, which makes it less likely that they will get value for money." The NAO report said there was a "lack of predictability" over road spending adding that historically, local highway authorities spent more revenue on maintenance, but were now carrying out fewer routine activities such as clearing gullies which are essential to preventing water seeping into roads' sub-structure.