Find or Sell any Parts for Your Vehicle in USA

Monroe Dx966a Brake Pad Or Shoe, Front-monroe Dynamics Brake Pad on 2040-parts.com

US $57.82
Location:

Salt Lake City, Utah, US

Salt Lake City, Utah, US
Returns Accepted:Returns Accepted Refund will be given as:Money Back Item must be returned within:14 Days Return policy details:Items must be returned in original packaging in salable condition. Any item that has been installed can not be returned. Refunds will be issued once the merchandise is received. Return shipping will be paid by:Buyer Restocking Fee:No Part Brand:MONROE Manufacturer Part Number:DX966A SME:_2316 Placement on Vehicle:Front UPC:00048598974532 Product Description - Abbreviated - 12:BRAKE PD AAIA Part Type Description:DISC BRAKE PAD Product Description - Long - 80:MONROE DYNAMICS BRAKE PAD Product Description - Extended 240:MONROE DYNAMICS BRAKE PAD Key Search Words - 80:MONROE DYNAMICS BRAKE PAD Product Description - Short - 20:MONROE BRAKE PD

Pads & Shoes for Sale

Rhonda Renaissance Part 2: Paint vs. vinyl

Wed, 28 Mar 2012

We dispensed with the basics in Part 1 on Monday: There's a 1963 Pontiac StarChief in the parking garage of Autoweek HQ. It needs of a new coat of something for the summer, so let's explore some of the options confronting today's refinish customers, where candy paint is no longer the only game in town. Let's start with vinyl wraps: We've seen them, felt them and picked at them at shows and in shops.

Concept Car of the Week: Renault Racoon (1992)

Fri, 16 Aug 2013

As far as wacky concepts go, the Racoon surely has to be up there with the best of them. Designed and engineered like no other car before, the off-road and amphibious capabilities of the Racoon stretched automobile versatility to new levels. With its big eyes and smiley face, it has the same happy expression as its sister, the Twingo.

Green Light For More Smart Motorway Schemes

Wed, 09 Jul 2014

THE Government has announced plans to speed up journey times on selected parts of the nation’s motorway network. As a result, work will start to convert the hard shoulder into a running lane on two sections of the M1 and on a stretch of the M3. The M1 work will be between junctions 28 and 31 in Derbyshire and between junctions 32 and 35a in South Yorkshire, with claims that it will boost capacity by up to a third and improve journey times by up to 10%.