New T-h Marine Flow-max Sure Seal Ball Scupper Fms-1-0 Clear Twist Off Fits All on 2040-parts.com
Manchester, Massachusetts, United States
|
New T-H Marine FLOW-MAX Sure Seal Ball Scupper.
Model # FMS-1-0 Clear, "Twist Off To Clean, Fits All Existing Hole Patterns". This auction is for one. Have 2 available, email ASAP and I'll adjust the invoice. BOATYARD STOCKROOM SPRING CLEAN OUT!! SEE OUR OTHER ITEMS!! INSANE PRICES!! Shipping to Lower 48 Continental US states ONLY via USPS, please provide a street address. |
Plumbing & Ventilation for Sale
New apollo 1 1/2" bronze 3 way ball valve w/ lever 400 psi for wog model 7060701
Dometic 301197406 974msd portable toilet 2.6 gal gray w/ brackets msd(US $166.52)
Forespar 906008 1-1/2" x 3" threaded flush thru-hull connector(US $21.99)
Seatech 1885746 black 15 mm 90 degree female swivel elbow boat fitting(US $11.00)
Forespar 906004 thru-hull 1in flush w/nut(US $46.00)
Sherwood impeller #10077(US $24.00)
Transmissions gone wild!
Wed, 07 Aug 2013If you've been car shopping recently, or just paying attention to Autoweek car reviews, you've noticed that the six-speed automatic -- de rigueur as recently as a year ago -- suddenly has ratio envy. The new hotness? Eight- and nine-speed automatic transmissions.
Who's Where: James Hope appointed Director of Design at Chery Motors
Fri, 30 Mar 2012James Hope has been appointed Corporate Director of Design at Chery Motors, the Chinese state-owned carmaker. He joins Chery from General Motors, where he held the position of Assistant Chief Designer since February 2008. Hope took up his new position on 16 January, based in Chery's Shanghai satellite studio from where he will report directly to Chen Anning, Chery's Head of Product Development.
Nissan Juke-R is prepared for its heart transplant: Video
Wed, 19 Oct 2011Nissan, in its quest to make the craziest compact car in the world, has released another video of the Nissan GT-R-to-Juke engine transplant. The video shows some of the frame cutting that needed to be done to fit the twin-turbocharged V6 into the Juke small crossover, along with the roll cage being welded in. Jigs are also attached to keep the frame straight while the work is going on.
