NISSAN 240 SX - HEADERS.
THIS IS A GENUINE PART ,JAPAN MADE .
VEHICLE HAD 144,000 MILES
THIS PART IS UNDAMAGED AND READY TO BE INSTALL.
IT INCLUDES THE O2 SENSOR.
Exhaust Headers for Sale
Advance adapters slickfit headers shorty chrome 1 5/8" primaries 717054(US $318.75)
Hedman street hedders full-length painted 1 5/8" primaries 69099(US $219.97)
02 03 04 05 06 acura rsx base model stainless header manifold(US $100.95)
2006-2010 honda civic si 4-1 stainless manifold racing header 07 08 09(US $125.95)
1992 1993 1994 1995 1996 honda prelude non-sh stainless headers(US $139.95)
1994-2001 acura integra gsr b18/b16 stainless header 4-1 95 96 97 98 99(US $107.95)
Audi Urban Concept Previewed
Wed, 10 Aug 2011Audi Urban Concept It’s quite interesting when things happen back to front; where you get to see the chicken before the egg. And that’s what’s happened with the Audi Urban Concept. For some reason Audi seems to think that rolling out a modern-day Messerschmitt with a full black and white swirly paint job in theĀ Potsdamer Platz would go unnoticed.
Car Design Awards China 2012 winners announced
Sat, 21 Apr 2012The third annual Car Design Awards China competition came to an end earlier this evening as the winners of the 10 categories were announced along with the nomination for 2012 Student Designer of the Year - Xiao Hangjie, a student at Hunan University. The awards ceremony was held at the studios of CH-Auto in Beijing in the presence of an audience of renowned designers and judges from both domestic and international OEMs, with esteemed designer Chris Bangle acting as master of ceremonies. At the concluding judging session held in Beijing in March, one of the judges, Simon Loasby, Director of Design at VW China, said, "It was so difficult for us to decide on a winner, the entrants were so strong.
GM stops Chevy Volt production to trim inventory
Fri, 02 Mar 2012General Motors will idle the Detroit-area assembly plant that builds the Chevrolet Volt for more than a month to curb rising inventories of the plug-in hybrid. On March 1, GM told 1,300 workers at its Detroit-Hamtramck assembly plant in Michigan that it will shut down production for five weeks, starting the week of March 19. GM plans to resume production on April 23, spokesman Chris Lee said.
