Find or Sell any Parts for Your Vehicle in USA

Oxygen Sensor-oe Style Right/left Bosch 15341 on 2040-parts.com

US $83.54
Location:

Front Royal, Virginia, United States

Front Royal, Virginia, United States
Condition:New Quantity Sold:sold individually Other Part Number:KN4-606, AP4-606, 234-4272, ES20361-11B1, 75-3898 SKU:BOS:15341 Interchange Part Number:234-4855, 25672, 234-4856, 250-24707, OS5539 Brand:Bosch SBL-2 Eyelets Eyelet to Eyelet (Center):Connector, flat contacts Manufacturer Part Number:15341 Oxygen Sensor Type:Narrow-Band Heated MFG Name:ROBERT BOSCH LLC UPC:00028851153416 Supplier Company Name:Robert Bosch LLC Fitment Footnotes:Oe Sensor Technology; Oxygen Sensor Connector Type:OE Connector Quantity Needed:1; Internet Product Code (IPC):2401EFA1044

Peugeot RCZ R with 260bhp to debut at Goodwood FoS

Mon, 10 Jun 2013

The Peugeot RCZ R (concept pictured) will debut in July at Goodwood We saw the first glimpse of the Peugeot RCZ R at the Paris Motor Show when Peugeot revealed the RCZ R as a concept at the same time as it revealed a facelift for the RCZ range. At the time we said we expected the RFCZ R to turn from concept to reality by the end of 2013, and today Peugeot has revealed that the RCZ R will make its debut at the Goodwood Festival of Speed in July before going on sale. The production RCZ R gets a tweaked version of the 1.6 litre turbo found in other RCZs (and other PSA/BMW cars) with 265bhp and the same range of styling tweaks the regular RCZ facelift got last year.

Ford Transit to replace Econoline van in 2013

Thu, 08 Dec 2011

Ford is finally putting the Econoline out to pasture. The full-size van has been has been available in one form or another since 1961. The E-series will be replaced by the European-designed Transit van, which will arrive with a global platform in 2013.

SEAT lets the train take the strain

Mon, 19 Jan 2009

SEAT by Train from the Martorell Factory to the Port of Barcelona The building of this project started in 2005 -  a joint venture between SEAT and Autometro – as an innovative way to transport cars from the factory to the port, and has made a big difference to the traffic on Catalan roads in that time, taking more than 20,000 lorries off the roads and racking up a big saving in SEAT’s carbon footprint. Throughout 2008 the rail link transported cars on twice daily runs on double-decker carriages over 400 metres long, carrying more than 170 cars at a time. Try doing that on the roads!