Polaris Snowmobile Anti-theft Kit #2870920 on 2040-parts.com
Jackson, New Jersey, US
Brand new in box, Theft Deterrent Kit lists for 34.99, inventory clearance sale.
Accessories for Sale
Snowmobile handlebar bag(US $10.00)
Nos 1985 arctic cat jag panther pantera factory service manual snowmobile sled(US $29.99)
Arctic cat team flag banner sign 4x2 ft snowmobile limi(US $24.99)
Arctic cat team flag banner sign 4x2 ft snowmobile limi(US $14.99)
Ski doo very limited flag banner 4x2 bombardier amazing(US $14.99)
Oem skidoo reversible mirror for snowmobile mach formula new ski doo(US $14.95)
New (2014) BMW X5: Full UK price list from X5 sDrive25d to X5 xDrive50i
Fri, 31 May 2013The new BMW X5 costs from £42,590 for the sDrive25d We had the reveal of the new BMW X5 this week (which is either a new X5 or a facelift for the current X5, depending on how you look at it, and also the 2013 or 2014 X5) and now we have full UK prices for the new range. The starting point will be the X5 sDrive25d – BMW’s first rear wheel drive X5 and the first with a 4-cylinder engine – which will cost from £42,590 and comes with BMW’s 2.0 litre diesel which will give economy of 50.4mpg and emissions of 155g/km. BMW expect the same figures to apply to the next up the range – the X5 xDrive25d – which gets the same four-pot diesel as the sDrive version but has 4WD.
Audi A8 W12 and Audi S8 cancelled for 2010
Sat, 25 Apr 2009The 2010 Audi A8 will not have the W12 or the S8's V10 Update 1/12/2009: It looks like Audi has had a change of heart and has now confirmed plans for an S8 for 2011. Update 16/04/2010: And to completely trash this article, we now have confirmation that the 2011 Audi A8 L will come complete with W12. Oh, well.
Workers misspell 'bus' on road markings
Tue, 26 Aug 2014WORKMEN have given road users something to chuckle about by misspelling the word 'bus' during roadworks. "Bup stop" was painted on to the road surface in Bristol in large yellow lettering at the end of last week, with the stencilled letter P used instead of S. The mistake was made as part of road repairs which are likely to last up to four weeks in the Old Market area of the city centre.
