Premium Lower Ball Joint - Front Left Driver Or Right Passenger Side Suspension on 2040-parts.com
ON, CA
Ball Joints for Sale
Premium lower ball joint - front left driver or right passenger side suspension(US $12.90)
Premium lower ball joint - front left driver or right passenger side suspension(US $20.97)
Premium upper ball joint - front left driver or right passenger side suspension(US $17.10)
Premium upper ball joint for front right passenger side suspension rh(US $17.00)
Premium upper ball joint - front left driver or right passenger side suspension(US $18.68)
Premium lower ball joint - front left driver or right passenger side suspension(US $12.90)
The complete idiot's guide to drag racing
Fri, 11 Apr 2014First, get yourself a car. A 550-hp dragster will do nicely. Sure, you could run what you brung, but a Miata's stock 1.8-liter would look mighty silly making a pass, and we don't have all day anyway.
Concept Car of the Week: Mercedes-Benz VRC (1995)
Fri, 31 May 2013The question of automobile versatility has been a real challenge for decades. Nowadays, car manufacturers keep coming up with hundreds of new segments, sub-segments, crossovers, and crossovers of crossovers... Most of them end up Jack-of-all-trades, master of none.
Lamborghini CO2 reduction Press Release
Sun, 07 Jun 2009Lamborghini CO2 Reduction Press Release • The construction of a large photovoltaic plant, combined with an energy-saving project, will achieve a 30% reduction in the factory’s CO2 emissions by 2010 • Modifications to vehicles will result in a 35% reduction in CO2 emissions by 2015 Automobili Lamborghini announces its intention to complete its program of environmental sustainability in record time by presenting new plans which will enable the company: The plans for reducing emissions will thus involve two areas: modifications to the Lamborghini factory in Sant’Agata Bolognese, and development in vehicle design. To redefine its industrial processes in accordance with its policy of environmental sustainability, Lamborghini has just begun a project to complete installation of a large photovoltaic system by the end of 2009. The roof-top plant will produce 1,582 Megawatt hour (MWh) of “green” energy per year, which translates into a 20% reduction in CO2 emissions (-1,067,820 Kg/year) by 2010.
