Pypes 2-1/2 In Pipe Diameter Bolt-on Electric Exhaust Cut-out Kit P/n Hve10k on 2040-parts.com
Ocala, Florida, United States
Other for Sale
- Quick time performance qtp 10300 3" stainless steel exhaust cutout(US $72.05)
- Allstar performance small block chevy exhaust port block-off plates p/n 34212(US $25.39)
- Pypes mustang 1998-2004 2-1/2 in diameter off-road exhaust h-pipe p/n hfm53(US $131.99)
- Schoenfeld 3-1/2 in od to 3 in id exhaust pipe reducer p/n 3530(US $19.77)
- Slp loud mouth exhaust system mopar charger/magnum 2011-13 p/n d31040(US $644.78)
- Race ready 3 in pipe aluminum dual electric exhaust cut-out kit p/n ec300d(US $450.99)
First Sight: Fenomenon Stratos
Tue, 01 Mar 2005The Geneva Show sees a surprising newcomer to its stands in the shape of Fenomemon Ltd and their concept Stratos project. This new London-based vehicle design agency is led by a current student on the Royal College of Art's Vehicle Design course, Chris Hrabalek, who has masterminded a complete full-size mockup of a reborn Lancia Stratos concept for this year's Geneva Show. In a world where multinational companies spend several million dollars on a concept car and stand, that's a phenomenal achievement.
What's the difference between styling and design? [w/Video]
Mon, 14 Oct 20132953 Analytics' managing director Jim Hall explains the subtle but important difference between design and styling in a video from Autoline.tv. Hall believes design means how well the object functions, looks and feels, while styling is predominantly about giving it presence and increased aesthetic value. It's important then, he argues, not to interchange the two words.
GM to double size of battery lab
Mon, 12 Apr 2010General Motors says it will spend $8 million to double the size of its Global Battery Systems Lab, which the company claims is the largest and most technologically advanced automotive battery lab in the United States. GM says the expansion will speed up the development of hybrid and electric vehicles, such as the upcoming Chevrolet Volt, by improving on-site testing of battery cells and systems. When finished, the lab will be 30,000 square feet bigger than it is now, for a 63,000-square-foot total.