Find or Sell any Parts for Your Vehicle in USA

Racing Beat 4 Pc Suspension Spring Set 14024/14025 Fits 1993-95 Mazda Rx-7 on 2040-parts.com

US $150.00
Location:

Condition:New other (see details): A new, unused item with absolutely no signs of wear. The item may be missing the original packaging, or in the original packaging but not sealed. The item may be a factory second, or a new, unused item with defects. See the seller’s listing for full details and description of any imperfections. See all condition definitions Brand:Racing Beat Fitment Type:Performance/Custom Manufacturer Part Number:14024/14025 Country/Region of Manufacture:Japan Placement on Vehicle:Front, Left, Rear, Right Performance Part:Yes

Lower Kits & Parts for Sale

1984 Ford Mustang SVO: American metal, European performance

Mon, 14 Apr 2014

If the 1978 Ford Mustang King Cobra II isn't quite your thing, why not give the 1984 Ford Mustang SVO a try? In the Jan. 3, 1983, issue of Autoweek, we previewed a different take on the pony car -- one that promised "visual subtlety with unsubtle performance." Built on the Fox platform, the Mustang SVO (for "Special Vehicle Operations") wasn't supposed to be a flashy package for the wannabe racer -- it was designed from the ground up to be a balanced road car, "a state-of-the-art performance vehicle for the absolutely no-compromises performance buyer." And when we say "ground up," we mean it.

GM will launch 60-day money-back guarantee

Thu, 10 Sep 2009

General Motors Co. is taking a page from the retail industry with its latest marketing blitz in an effort sell more cars: a 60-day money-back guarantee. The initiative--unorthodox for an automaker--starts Monday and covers 2009 and 2010 model-year cars from GM's surviving brands, Chevrolet, Cadillac, Buick and GMC.

Call for reform over road repair funding

Fri, 06 Jun 2014

FUNDING patterns mean most road maintenance is being carried out in "less-efficient, cold and wet" times, a report from a Government spending watchdog has said. The current pattern of funding, combined with the need to spend money within the financial year, means that most maintenance work goes on between September and March, said the report from the National Audit Office (NAO). It went on: "Although this is less disruptive for road users, it is less efficient than carrying out the work at other times of year because materials can be more difficult to handle in cold and wet conditions, and daylight hours are shorter." The report went on: "As a result of the additional funding for emergency repairs, which is made available at the end of the financial year, almost all highways authorities need extra capacity from the market at the same time, which makes it less likely that they will get value for money." The NAO report said there was a "lack of predictability" over road spending adding that historically, local highway authorities spent more revenue on maintenance, but were now carrying out fewer routine activities such as clearing gullies which are essential to preventing water seeping into roads' sub-structure.